Attachment 6 - Stormwater Management Plan

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (26.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                            LEGEND

                                                                                                                                                                                                                                                                                                                                    EXISTING CONTOURS (0.5m)


                                                                                                                                                                                                                                                                                                                                    WORKS AREA


                                                                                                                                                                                                                                                                                                                                    FLOW DIRECTION

                                                                                                                                                                                                                                                                                                                                    EXISTING FLOWPATH
                                                                                EXISTING HES BASIN
                                                                                                                                                                                                                                                                                                                                    EXISTING FLOWPATH TO DAMS


                                                                                                                                                                                                                                                                                                                                    TEMPORARY DRAIN


                                                                                                                                                                                                                                                                                  ENSURE CLEAN WATER DRAIN AND CULVERT
                                                                                                                                                                                                                                                                                  IS MAINTAINED FOR OTHER CATCHMENTS

                                                                                                          ENSURE CULVERT IS OPEN AND FLOW
                                                                                                          IS DIRECTED TO EXISTING HES BASIN

                                                                                                                                                                                                                                                                                  TEMPORARILY BLOCK DRAIN AND FORM TEMPORARY DRAIN
                                                                                                                                                                                                                                                                                  BACK TO HES BASIN IF APPROVED BY NSC. IF BASIN CANNOT
                                                                                                                                                                                                                                                                                  BE UTILISED DUE TO ADDITIONAL CATCHMENT AREAS
                                                                                                                                                                                                                                                                                  STAGING AND EROSION CONTROL FOCUS WILL BE REQUIRED




                                                                                              APPLY SOIL BINDER OR COVER ANY
                                                                                              DISTURBED AREAS ON NORTHERN SIDE OF
                                                                                              CURRENT AND FUTURE DRAINAGE CHANNEL




FOCUS ON STAGING AND EROSION CONTROL
IN AREA THAT CANNOT GRADE TO HES BASIN




                                                                                                                                                    INSTALL TEMPORARY DIVERSION BERM TO DIRECT FLOW
                                                                                                                                                    TO EAST AND TO EXISTING HES BASIN IF FUTURE DRAIN
                                                                                                                                                    CANNOT TEMPORARILY BE GRADED BACK TO EAST. IF
                                                                                                                                                    DRAIN CANNOT BE CONSTRUCTED, STAGING WITH A
                                                                                                                                                    FOCUS ON EROSION CONTROL WILL BE REQUIRED




                                                                                                                                                                                                                                               CLIENT                                                     PROJECT
                                                                                                                                                0                    30                                                                                        NOOSA SHIRE COUNCIL
                                                                                                                                                                                                                     COPYRIGHT C                                                                                              NOOSA LANDFILL EXPANSION
                                                                                                                                                                                                                 TOPO GROUP PTY LTD
                                                                                                                                                                                                                                               DRAWN                   DESIGNED           DATE            DRAWING TITLE
                                         B    REVISION FOLLOWING NSC COMMENTS                                       KR           16/09/21
                                                                                                                                                      SCALE 1:1500                                        THIS DOCUMENT MAY NOT BE COPIED OR            KR                      KR           14/09/21               CONCEPT EROSION AND SEDIMENT CONTROL
                                                                                                                                                                                         ISSUED FOR USE   TRANSMITTED IN ANY FORM OR BY ANY
                                         A    ORIGINAL ISSUE                                                        KR           14/09/21                                                                 MEANS IN PART OR IN WHOLE WITHOUT
                                                                                                                                                                                                                                               RPEQ / SIGNATURE (IF REQUIRED)                                          CAPPING WORKS - WESTERN BATTER
                                                                                                                                              NORTH
                                                                                                                                                                     A3                                   THE WRITTEN CONSENT OF TOPO GROUP                CPESC - 5395, RPEQ - 15954                     PROJECT No                     DRAWING No            REVISION
                                   REVISION   DESCRIPTION                                                       APPROVED BY       DATE                                                                                  PTY LTD.                                                                                          20-0211                CESCP-07           B
Log in to download the original file

Attachment 6 - Stormwater Management Plan.pdf · 26.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.