Council archive · source document
Decision Letter - Change to an Existing Approval [As Published] · 132007.786.02
Officer: Jack Lewis
Direct Telephone: (07) 5449 5183
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 2007/786
Your Reference:
17 November 2009
T01 Architecture & Interiors
63 Nickson Street
SURRY HILLS NSW 2010
Dear Sir/Madam
Change to an Existing Approval
Integrated Planning Act 1997
I refer to your request to make a change to an existing approval. On 16 November 2009 Council
decided your requested changes.
Details of the decision with the consolidated conditions are as follows:
1 APPLICATION DETAILS
Application No: 2007/786
Street address: 15 Whale Drive, Sunshine Beach
Real property description: Lot 8 RP 858520
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
Council on 24 October 2007 decided to issue the following type of approval:-
Development Permit for a Material Change of Use – Detached House
In relation to the request to make a change to the existing approval, Council on 16 November 2009
decided to:
A. Approve a change to the development approval with changes to Conditions 1 & 5.
B. Issue a Change to Development Approval.
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
Page 1 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
2007/786
4 ASSESSMENT MANAGER CONDITIONS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and may
be amended by these conditions.
Plan No. Rev. Plan / Document Name Date
0614-GA01 N Lower Ground Floor – Thomas de Cruz 07/07/09
Architects
0614-GA02 N Ground Floor – Thomas de Cruz Architects 07/07/09
0614-GA03 L First Floor – Thomas de Cruz Architects 07/07/09
0614-GA04 J Roof Plan – Thomas de Cruz Architects 07/07/09
0614-GA10 B North-East Elevation – Thomas de Cruz 04/08/09
Architects
0614-GA11 B South-East Elevation – Thomas de Cruz 04/08/09
Architects
0614-GA12 B South-West Elevation – Thomas de Cruz 04/08/09
Architects
0614-GA13. B North-West Elevation – Thomas de Cruz 04/08/09
Architects
0614-PA50. B Building Relative to Existing Ground Level – 22/10/09
Thomas de Cruz Architects
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to
service the detached house. The tank is to be installed to ensure water from the tank can be
used both:
3.1 For external use such as watering gardens, irrigation, ornamental ponds or water
features, topping up swimming pools, outdoor cleaning; and
3.2 For use in flushing of toilets internal to the building.
4. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
5. The building height shall not exceed 8.8m above natural ground level.
6. The building shall not exceed 2 stories as defined by The Noosa Plan.
7. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the
maximum allowable building height and stories as required by either the conditions of approval
or the Planning Scheme.
Page 2 of 8
Page 3
2007/786
8. A minimum of 20% of the site shall be retained as soft landscaping.
9. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. In this regard, the
removal of vegetation shall not extend beyond 3 metres of the building footprint of the
Detached House.
10. All other vegetation shall be protected from interference resulting from clearing or construction
activities by:
10.1 Clearly marking vegetation to be retained with flagging tape;
10.2 Installing protective fencing around the drip line of the vegetation;
10.3 Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
cause interference with vegetation; and
10.4 Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
11. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
11.1 Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
11.2 Disposal for firewood.
11.3 Disposal for landscaping purposes.
11.4 Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
11.5 The applicant is advised that other methods may be considered provided full details of
the method are submitted.
11.6 The applicant is advised that burning off is an unacceptable method of disposal.
12. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
13. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
not constructed under overhead electricity transmission lines, or within any easements.
14. A geotechnical report, prepared by a registered professional engineer shall be obtained, and it
should either:-
14.1 certify that the site is not at risk from landslide emanating from the site or from other
land; or
14.2 identify methods of stabilising all buildings, accessways and uses areas; and where the
geotechnical report identifies methods of stabilising buildings, accessways and uses
areas. The development shall implement those methods, which are recommended
15. External colours and finishes of the building shall comprise of muted/environmental tones that
blend with the natural environment.
16. All vegetation between the frontage and the building shall be retained (except where required
to be removed for driveway access).
Page 3 of 8
Page 4
2007/786
17. Any tree lost in the area described in condition 16 during construction shall be replaced, at the
completion of works, with a 100L size tree of native coastal species (see Planning Scheme
Policy 3 – Landscaping Plants and Guidelines).
18. The built to boundary wall on the western elevation shall not exceed 9m in length or have a
maximum height above natural ground level of more than 4.5m.
19. Sediment and erosion control measures must be in place prior to the demolition of the house.
If such measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued.
Such fines can be issued if sediments from the site are found to enter or have the potential to
enter Council’s stormwater system or natural waterways.
20. The Development Permit for a material change of use lapses if the use has not happened by
24 October 2011, unless an application to extend the currency is approved by Council.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan No. Rev. Plan / Document Name Date
0614-GA01 N Lower Ground Floor – Thomas de Cruz 07/07/09
Architects
0614-GA02 N Ground Floor – Thomas de Cruz Architects 07/07/09
0614-GA03 L First Floor – Thomas de Cruz Architects 07/07/09
0614-GA04 J Roof Plan – Thomas de Cruz Architects 07/07/09
0614-GA10 B North-East Elevation – Thomas de Cruz 04/08/09
Architects
0614-GA11 B South-East Elevation – Thomas de Cruz 04/08/09
Architects
0614-GA12 B South-West Elevation – Thomas de Cruz 04/08/09
Architects
0614-GA13. B North-West Elevation – Thomas de Cruz 04/08/09
Architects
0614-PA50. B Building Relative to Existing Ground Level – 22/10/09
Thomas de Cruz Architects
Page 4 of 8
Page 5
2007/786
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
1.1. On a Sunday or public holiday, at any time; or
1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
2. Prior to the commencement of the development, a plumbing assessment must be obtained
from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage
Act 2002 (as applicable)
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Detached House Driveways Code
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
Page 5 of 8
Page 6
2007/786
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Decision Notice History
24 October 2007 - Original Decision Notice.
16 November 2009 - Approved Change with
amendments to Conditions
1&5
Yours faithfully,
Denis Wallace
Senior Development Planner
Page 6 of 8
Page 7
2007/786
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated (6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
for the application are not available against the part of
Division 8 - Appeals to court relating to the approval that represents the concurrence agency’s
development applications response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following- jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application if-
application; (a) the development application involves impact
(b) a matter stated in a development approval, including assessment; and
any condition applying to the development, and the (b) the advice agency told the applicant and the
identification of a code under section 3.1.6;1 assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must be Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
(co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of the
(3) An appeal under subsection (1)(e) may be started
following notices have been given may appeal to the
at any time after the last day a decision on the matter
court against the decision in the notice-
should have been made.
(a) a notice giving a decision on a request for extension
Appeals by submitters
of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
(b) a notice giving a decision on a request to make a
appeal to the court about-
minor change to an approval.
(a) the giving of a development approval, including any
(2) The appeal must be started within 20 business
conditions (or lack of conditions) or other provisions
days after the day the notice of the decision is given to
of the approval; or
the person.
(b) the length of a relevant period for the approval.
(3) Subsection (1)(a) does not apply if the approval
(2) The appeal must be started within 20 business resulted from a development application (superseded
days (the “submitters appeal period”) after the day the planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to application under a superseded planning scheme.
the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be started at
(4) If an application involves both impact assessment any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are should have been made.
available only for the part of the application involving
impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application (no co-respondents)
are available only for the aspects of the development that 4.1.31.(1) A person to whom any of the following notices
would have required public notification under the have been given may appeal to the court against the
repealed Act. decision in the notice-
(a) a notice giving a decision on a request to change or
cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 7 of 8
Page 8
2007/786
(b) a notice under section 6.1.442 giving a decision to (c) the decision to give a preliminary approval when a
change or cancel a condition of a development development permit was applied for;
approval. (d) the length of a period mentioned in section 3.5.21
(2) The appeal must be started within 20 business relevant period;
days after the day the notice of the decision is (e) a deemed refusal.
given to the person.
(2) An appeal under subsection (1)(a) to (d) must be
(3) Also, a person who has made a request started within 20 business days (the “applicant’s appeal
mentioned in subsection (1)(a) may appeal to the period”) after the day the decision notice or negotiated
court against a deemed refusal of the request. decision notice is given to the applicant.
(4) An appeal under subsection (3) may be started at (3) An appeal under subsection (1)(e) may be started
any time after the last day the decision on the at any time after the last day a decision on the matter
matter should have been made. should have been made.
Appeals against decisions to change approval conditions The Registrar for the Building and Development
under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court 4.1.36 Appeals about particular infrastructure
against- charges
(a) the decision; or (1) This section applies to a person who has been
(b) a deemed refusal of the application. given, and is dissatisfied with, an infrastructure charges
notice or a regulated State infrastructure charges notice.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of (2) The person may appeal to the court against the
the decision is to be given to the person. notice.
(3) An appeal under subsection (1)(b) may be started (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter after-
should have been made. (a) if the notice is given because of a development
Appeals against local laws approval or master plan approval-the day the
applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the (b) otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the (4) An appeal under this section may only be about-
planning scheme may appeal to the court against the
(a) whether a charge in the notice is so unreasonable
decision or the conditions applied. that no reasonable relevant local government, State
(2) The appeal must be started within 20 business infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the have imposed it; or
applicant.
(b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the under this section can not be about the methodology
Integrated Planning Act 1997 as follows: used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to charges schedule or regulated State infrastructure
development applications charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval, including
any condition applying to the development, and the
identification of a code under section 3.1.6;3
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override local
planning instrument)
Page 8 of 8
Used in these records
Decision Letter - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 59 KB (small file)
- File type
No other editions are linked here.