Council archive · source document
SUPERSEDED - Decision Notice - 010.2008.00001704.001 [As Published] · 142008.1704
2008/1704 Page 7 of 13 [OCR of page images] 2008/1704 7. Any ships and equipment you or your agent use must comply with the Transport Operations (Marie Safety) Act 1994, the Transport Operations (Marie Safety) Regulation 2004 and the Transport Operations (Marme Pollution) Act 1995. 8. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act 1994 and the Transport Operations (Marine Safety) Regulation 2004 9 Any ship moored at this pontoon/jetty must not impede the safe navigation of other ships or restrict safe access to or from neighbouring structures 10, Any ship moored or dry berthed at this structure must not exceed the following sizes: Wet Berth Dry Berth Length Overall - 9 metres N/A Beam - 3 metres 11, The contractor must construct the pontoon/jetty within two years from the date of approval, If construction is not completed, you will need additronal or amended comments from the Regional Harbour Master. Manttime Safety Queensland does not need to be further consulted if all of the above conditions are met The above conditions must be included im your application to the assessment manager. This agency will also forward a copy of this letter to the Assessment Manager. Yours sincerely Captain Richard C Johnson Regional Harbour Master (Brisbane) Maritime Safety Queensiand Page 2 of 2 Page 7 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice - 010.2008.00001704.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.