Capital Works Schedule
As at 30-Apr-2015
Noosa River Flood Magation Strategy a) "$0,000 a ~ O.00%
Noosa River Hydraulic Model 0 300.000 o 0.00%
Business Distnbuton and Land Needs Praject 0 60.000 o coo%
Total Planning Scheme 265,000 640,000 6.645 1.35%
Electne Bus Feasinilty Study 100,000 100,000 91,976 91 9E%
Noose Heads - Noosa Parade Stop 114 50,000 50.000 1,865 373%
Noosa Heads - Noosa Parade Stop 26 40,000 40.000 2.532 733%
Noose Heads - Noosa Parade Stop 27 40,000 40.000 2.614 704%
Noosa Heads - Noosa Parada Stop 28 65,000 65,000 320 049%
Noosa Junction Transit Centre - improve 40,000 40.000 0 0.00%
Peragian Bach - David Low Way Stop 87 125,000 125,000 3,008 242%
Sunnse Beach - Wolomia Way Stop 11 40,000 40,000 1,174 293%
Whote of Shire ~ bus shelter DDA 20,000 20.000 24,165 120.45%
Noosa Bus Station Sater Streats Program 175,600 117,900 91,138 944%
Noosa Meads - Noosa Parade Translink 700598 0 40,000 480 120%
Noosa Heads - Noosa Parade Translink 700584 0 50,000 932 1.86%
Tewerilin - Butler St Transink 700490 0 50.000 1,57 3.91%
Tewantin - Gutler St Transank 700491 0 35,000 2.064 5.87%
Noosaville - Weybe Ro Transiink 700585 0 40,000 7.056 17 64%
Noosaville - Weyda Re Transiink 700521 0 65,000 273 042%
Noosavilla - Weybe Rd Translink 700522" 0 40.000 1411 27TE%
Noosaville - Weyba Rd Translink 700456 0 30,000 1,710 342%
Noosavilla - Weyba Re Translink 700823 0 40,000 1.824 456%
New Noosa Bus Shelters - Design 0 60,000 62.335 103.89%
Total Public Transport Infrastructure 695,500 1,107,900 219,145 19.78%
Sealed Road Pavement surveys and Investigations 0 51,600 5,196 10.07%
Whole of Shire - pavement surveys 60,000 6.000 30,136 23%
Whole of Sitire - reseal and rehab 5,000,000 §,553,610 3,114,149 04%
Noosa Heads - Noosa Parade Master Plan 100,000 a 0 0.00%
Noosaville - Eumundi Noosa Road corndor 20,000 79.085 0 0.00%
Emergent ali frastructure renewal 2,951,698 1,003,039 11,640 1.16%
Dr Pages - Kinmond Cree& Ro Ine! Planning & Design 9 190,000 93,692 913%
Tewerttin Cooroy Noosa Rd Stages 2-6 Design Only 0 150,000 26,139 17 43%
Total Sealed Roads Network 8,131,898 7,047,335 3,200,952 45 42%
Girrawaen Sports Ground imgation 24,000 16.583 16,884 108. 35%
Girraween Sports Complex Lighting 0 16,000 0 0.00%
Total Sports Ground and Facilities 28,000 25,583 16,884 66.00%
Gympie Terrace Pipe Rehabilitation - investigation & Design 0 11,300 19 017%
Seaview Ck - open drain civil works 0 41633 44,829 107 68%
Gympre Terrace pipe rehabiitation 200,000 200,000 1,574 OTs
Re-liring of Ben Lexcen stormwater 50,000 &0.000 9,068 18.14%
Whote of Sire - stormwater OCTY 10,000 16,000 739 739%
Whole of Shire - stormwater structures 150,000 150,000 8,564 571%
Whole of Site - Flood mitgatan stage 2,802,970 2.802.970 405.232 14.28%
Marcus Geach Trstania Dve Stormwater Pipe Renewal 0 18,000 0 0.00%
Total Stormwater Drainage 3,212,976 3,283,903 470,025 14.31%
Forward Planriing for Streetscape and Road Conidor inerovame 0 1715 1.593 92.91%
Peragen Baach - pracinet planning 50,000 S000 0 0.00%
Total Streetscapes and Road Corridors 60,000 61,715 1,693 3.08%
Eenie Creek Road / Langura Street Intersechon safety upgrad 0 16.506 16,503 100.00%
Eenie Creek Roud / Walter Hay Drive Intersecton safety ungt 0 109.100 26,002 23.89%
Weyba Road Reet Street Intersection improvements - PIP 0 118.500 14,020 14.83%
Noosa Junction Disabled Parking CBA Frontage 0 20,000 19,331 98.66%
Page 135 of 171See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.