Original source · versioned page text
2015-05-26 Planning & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 26 MAY 2015
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction
ii. maintenance of safe pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the development
b. maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic and services and other relevant issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external fill sites/sources, the haulage route, type of vehicle
to be utilised during filling operations and frequency of usage. NB any damage to the
existing road system as a result of haulage operations shall be fully repaired at the
applicant’s expense
g. it is acknowledged that the Construction Management Plan will be a draft document
requiring finalisation upon appointment of the Principal Contractor employed to
construct the works and a final document will be required to be submitted at the Pre-
Start Meeting for the project.
Qualified Person
6. For the purpose of preparing an Acid Sulfate Soil and Groundwater Management Plan, a
qualified person is considered to be either:
a. a Registered Professional Engineer of Queensland (RPEQ); or
b. a soil scientist with a minimum of 5 years experience in the field of acid sulfate soils.
ENVIRONMENTAL HEALTH
Qualified Person
7. For the purposes of these development approval conditions relating to “Environmental
Protection – Compliance with General Environmental Duty with the Operation of the
Service Station”, a “suitably qualified and experienced person” means a person who has
such competence and experienced in relation to that activity as is recognised in the
relevant industry as appropriate for that activity. A suitably qualified and experienced
person includes personnel that have been trained, authorised and accredited by the
manufacturer of a specific item of equipment and/or process. Only a suitably qualified and
experienced person can test, repair and reset the equipment after a fault.
Page 23 of 171
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.