Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2015-05-26 Planning & Organisation Committee Agenda

of 171

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      26 MAY 2015


     a.   traffic management during all aspects of the construction phase including:
          i.     a Traffic Management Control Plan in accordance with the Manual of Uniform
                 Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                 control measures prior to construction
          ii.    maintenance of safe pedestrian access across the frontage of the site both
                 during daily construction and after daily construction has ceased
          iii.   proposed fencing to the site during the construction phase of the development
     b.   maintenance and protection of water quality and existing drainage lines through the
          construction site, through the implementation of appropriate erosion and sediment
          control measures
     c.   works programme identifying key components of the works and their respective
          durations
     d.   establishment of a communication protocol with the general public, adjoining owners,
          emergency services and local businesses to advise of agreed construction times,
          impacts on traffic and services and other relevant issues
     e.   identification of complaint management procedures including:
          i.     contact details for the on-site manager
          ii.    dispute resolution procedures
     f.   details on the location of external fill sites/sources, the haulage route, type of vehicle
          to be utilised during filling operations and frequency of usage. NB any damage to the
          existing road system as a result of haulage operations shall be fully repaired at the
          applicant’s expense
     g.   it is acknowledged that the Construction Management Plan will be a draft document
          requiring finalisation upon appointment of the Principal Contractor employed to
          construct the works and a final document will be required to be submitted at the Pre-
          Start Meeting for the project.
     Qualified Person
6.   For the purpose of preparing an Acid Sulfate Soil and Groundwater Management Plan, a
     qualified person is considered to be either:
     a.   a Registered Professional Engineer of Queensland (RPEQ); or
     b.   a soil scientist with a minimum of 5 years experience in the field of acid sulfate soils.
     ENVIRONMENTAL HEALTH
     Qualified Person
7.   For the purposes of these development approval conditions relating to “Environmental
     Protection – Compliance with General Environmental Duty with the Operation of the
     Service Station”, a “suitably qualified and experienced person” means a person who has
     such competence and experienced in relation to that activity as is recognised in the
     relevant industry as appropriate for that activity. A suitably qualified and experienced
     person includes personnel that have been trained, authorised and accredited by the
     manufacturer of a specific item of equipment and/or process. Only a suitably qualified and
     experienced person can test, repair and reset the equipment after a fault.




                                                                                    Page 23 of 171
Log in to download the original file

2015-05-26 Planning & Organisation Committee Agenda(PDF, 7MB).pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.