Original source · versioned page text
2015-05-26 Planning & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 26 MAY 2015 RECOMMENDATION That Council note the report by the Development Planner to the Planning & Organisation Committee Meeting dated 26 May 2015 regarding Application No. PBA15/0003 for a Development Permit for Building Works Assessable against a Planning Scheme situated at 14 The Peninsula, Noosaville and approve the application in accordance with the following conditions: When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with at all times while the use continues. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date WD.203 P8 Landscape Plan, prepared by Carole Tretheway Designs as 27.04.2015 annotated by Council WD.601 P8 Sections, prepared by Carole Tretheway Designs 27.04.2015 WD.601 P8 Sections, prepared by Carole Tretheway Designs 27.04.2015 Performance Bond 3. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be submitted to Council, to secure performance of all conditions of this approval, within 14 days after this Development Approval takes effect. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Setback to the Canal 4. The land area within 4.5 metres from the centre of the revetment wall must be maintained in accordance with the following requirements: a. a minimum of 25% of the area must be planted with shrubs b. a maximum of 25% of the area must be under hard pavement and the balance must be turf or ground covers c. any new trees planted must not have a mature height that exceeds 3 metres d. all land within 1 metre from centre of the revetment wall must not be planted with shrubs, and instead must be provided with either turf, ground cover. e. any side boundary fencing within 4.5 metres of the revetment wall must taper down to a maximum height of 1.2 metres at the revetment wall, and must have a height not exceeding 1.5 metres at a distance of 2.25 metres from the revetment wall. 5. The area between the retaining wall and house must remain as soft landscaping except for where the main stairs are located. Advice 6. The maintenance and integrity of the revetment wall is the responsibility of the property owner. Page 58 of 171
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.