Original source · versioned page text
2015-05-26 Planning & Organisation Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 26 MAY 2015
The works are not considered to negatively impact on the amenity function of the canal setback
as they will be extensively landscaped with 83% of the setback area either grass or garden. The
only hardstand area is the existing stairs that provide access from the dwelling to the jetty. The
wall creates a 2 tiered landscaped setting consisting of a garden on the upper level near the
house and a grass area on the lower level near the revetment wall, as shown in Photo 3.
Photo 3 - View from the south showing the 2 tiers.
The works are low level (0.8m) and do not block any views or create any overlooking of
neighbouring properties. Overall, the only relaxation sought is minor protrusions through the 1:4.5
batter line which are considered not to have significant impacts on the amenity function of the
setback area.
4. CONSULTATION
The application was forwarded to the following internal Council specialists:
Engineering Officer
Building Officer
Page 63 of 171
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.