2009/514
11. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
12. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by Council’s CEO.
13. All signage, including that for safety during construction shall be in accordance with the
Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
14. Safe pedestrian access on Banksia Avenue in the vicinity of the development shall be
maintained at all times. Should footpath / road closures be necessary to carry out construction
works, Council’s Construction Technical Officer (ph 0410 512 505) must be notified prior to the
proposed closure.
15. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved on drawing No<, it is the site's supervising engineer who is
responsible for ensuring that the sediment and erosion control measures have been designed
by an RPEQ or CPESC and constructed:
i. In accordance with "best practice" methods,
ii Revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and methods,
iii. Revised to address predicted rainfall events, and
iv. Achieve the desired environmental outcomes.
Council’s CEO may request further controls to be installed should approved measures be
inefficient.
16. These works are also to be in compliance with the relevant conditions of Development Permit
No. 2007/1490.
17. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
Water & Sewerage
18. All new water connections and meter installations shall be completed by Council at the
applicants cost.
19. The existing water connections to lot 3 must be disconnected at the main. Work to be
completed by Council at the applicants cost.
20. Provision a new water connection for lot 2. Disconnect existing water meter previously serving
Lot 2. Work to be completed by Council at the applicants cost.
21. The new sewer house service connection shall be completed by Council at the applicants
cost. Council's quotation for such works will be prepared upon request.
22. The new sewer inspection opening within Lot 1 shall be located a minimum of 1.0 metre from
the edge of the driveway.
23. Stormwater infiltration and filtration devices, and soakage trenches, must be located to provide
a minimum 1.5 metres horizontal clearance to any sewer house connections.
24. Any construction works to be undertaken in the vicinity of Council's existing water supply or
sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration to existing infrastructure must be met in
accordance with Council’s Planning Scheme Policy No. 6.
Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001ACB34.001.pdfRelated documentPublic source context ↗
Decision Notice - 010.2009.00000514.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.