Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

9.0 Assessment Tables

of 25
             Earthworks and Drainage                      Table 6.5.1.3 Criteria for assessment (part)

Performance outcomes                                                       Acceptable Outcomes
All activities
Earthworks and Drainage
PO37                                                                       AO37                                                             Y – Please refer to the proposed civil package for details of
Filling, excavation and retaining structures do not directly, indirectly   Filling and excavation works are designed and constructed to     civil and site works.
or cumulatively cause adverse impacts external to the                      ensure overland flow and/or flooding is not worsened, impeded,
development site by:                                                       or otherwise diverted to adversely affect other properties or
(a)    causing ponding of water on the site or nearby land;                downstream environments.

(b)    increasing flooding, which adversely affects the safety or
       use of any land upstream and downstream; or adversely
       affecting the flow of water in any overland flow path.

Log in to download the original (9.0 Assessment Tables.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.