Original source · versioned page text
9.0 Assessment Tables
Infrastructure
PO41 AO41 Y – The site is able to be connected to all necessary
Development is supported by adequate infrastructure and urban Development is connected to reticulated water supply, sewerage and reticulated infrastructure subject to relevant applications to the
services including reticulated water, sewerage, stormwater drainage, electricity infrastructure networks. service providers.
sealed roads, pathways, electricity and telecommunication
infrastructure.
PO42 No acceptable outcome provided Y – Development is not positioned over or within a proximity
Development does not adversely impact on the continued operation, that would jeopardize the existing and future function of
viability and maintenance of existing infrastructure or compromise nearby infrastructure.
the future provision of planned infrastructure.
Car Parking Table 6.5.1.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
All activities
Car Parking
PO43 AO43 Y – Parking for the development has been provided at the
Sufficient car parking is available to accommodate the number Parking is provided in accordance with Table 9.4.1.4 of the required rates for the business use for car, motorcycles and
and type of vehicles likely to be generated by the use on site. Driveways and Parking Code bicycles. Specifically 39 car parks are provided for the
industrial use and 1 is provided for the caretaker’s
accommodation, 8 motorcycle parks and 5 bicycle parks are
provided.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (9.0 Assessment Tables.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.