Original source · versioned page text
9.0 Assessment Tables
Performance outcomes Acceptable outcomes
Rehabilitation N/A – Development is not an extractive industry
PO35
Rehabilitation of the site, over the life of the project and on its No acceptable outcome provided
completion:
(a) provides progressive/ staged rehabilitation works;
(b) includes appropriate clean-up works (taking particular
account of areas of possible soil or water
contamination);
(c) results in a stable final landform;
(d) provides suitable drainage and hydraulic conditions; and
(e) achieves a suitable degree of revegetation consistent with
potential post extraction land use.
PO36 N/A – Development is not an extractive industry
Rehabilitation allows for suitable use of any water storage created No acceptable outcome provided
through the extraction process, having regard to water quality,
hydraulic conditions, land form and vegetation.
PO37 N/A – Development is not an extractive industry
Rehabilitation works for each operational stage are bonded to No acceptable outcome provided
ensure the effective return of disturbed areas to acceptable land
use suitability.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (9.0 Assessment Tables.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.