Minor Change Existing Approval MCU21/0228.02 & OPW21/0364.02 [As Published]
Site Access and Driveways
29. A sealed access driveway must be provided from David Low Way to all parking and
manoeuvring areas of the development. The works must include in particular:
a. a driveway crossover in accordance with Council’s Standard Drawing RS-051
b. suitable safety measures, including warning signage, to improve driver awareness of
pedestrians and enhance pedestrian safety.
Car Parking
30. A minimum of eight (8) car parking spaces must be provided and marked on the site and
made available and accessible at all times while the use is open for business. The works
must include in particular:
a. The small dwellings component of the development is to have available three (3)
parking spaces, one (1) space is to be available for visitors of the residential use, which
are clearly marked for that purpose and accessible at all times for visitor use.
b. The office is to have available five (5) parking spaces, which are clearly marked for that
purpose.
c. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
31. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
32. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
Pedestrian and Bicycle Facilities
33. Pedestrian and bicycle facilities must be provided for the development. The works must
include in particular a 2.0 metre wide footpath within the road verge for the entire length of
the site’s frontage to David Low Way.
Condition 33 is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
infrastructure identified by Council’s LGIP to service the development.
34. A minimum of two (2) bicycle spaces are to be provided and dedicated for use by those
associated with the Office.
Stormwater Drainage
35. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with the “Site Based
Stormwater Management Plan” – Reference number 188-002-001, Revision A prepared by
BAX Engineering dated 3 February 2022 and must include:
a. the deletion of the connection from the proposed infiltration pit to the existing infiltration
pit in the adjoining property, and
b. any modifications to the proposed infiltration pit necessary due to the deletion of the
abovementioned connection
The amended plans must be submitted to Council at least 5 business days prior to the pre-
start meeting.
Condition 35 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
36. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Page 5 of 18
Document Set ID: 24329699
Version: 3, Version Date: 24/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU21/0228.02 & OPW21/0364.02 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 206 KB (small file)
- File type
No other editions are linked here.