INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Attachments and supporting information (Complete Table ! - Use a separate row for each type of attachment or information, including information required under
this Parl) Please ensure all documentation submitted #8 form, including other Parts of Form 1, or owner's consent, eic, are securely attached {0 this Part of the Form.

   

 

 

Description of attachment or information i - 7 .

Table! i Title (if applicable) Method of delivery to

(2g. Pad CofFom 1 cwmers consent efenca ot rsowe® | (ag, Grea Adnan, James Set Trae Repo) Date assessment manager

1. WTE PAN (11.068- of) FEB 208 | APAND DEL VERE
Fool DECK DeTineS(If- ose-@) Nouzeg o
EN6INEERS REPORT OCF. 200%

 

 

 

 

 

 

 

oe cme sae sae

cL paneer animate nig: meANeNIO -* estapeaietee i vin ak
‘Portable Long Service Leave (PLSL) levy (Applicable for cartain building and construction work valued over, $80,000 only) ,
40. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (~“box if applicable)
Ci the application seeks a preliminary approval only;

ithe application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave)
Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for farming purposes:
land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or
controlling weeds or pests);

Hall costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or

(i the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-buider permit number stated). The receipted form must be sighted by the
assessment manager before a development permit can be given.

14. |s payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)
(CINo - End of Part A (Yes - Answer Q12 below

12, Has the PLSL levy been paid?

oO No - (NOTE: An application can be lodged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by the
Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit a Notification
and Payment Form to QLeave.)

Wes — Complete Table L and submit, with the application, the ‘yellow (Local Government's (Council) / Private Cerlifier's) copy of the receipted QLeave Form,

:, QLeave Project Number
TableL =|. Amount paid Date paid (6 digits, starting with A, BE, L or P}

 

 

 

 

 

 

 

 

 

OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)

 

. Receiving Reference
Fee (8) Date received Officer's name numbers

 

 

 

 

 

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER

 

 

 

To: Council. | have been engaged as the private certifier for the buitding work referred to in this application.

 

 

Date of engagement . . Name : 2 :} BSA Certification ficense number Building classifications

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable}

 

‘Amount pald Date receipted form :
Description of the work QLeave Project Number 9) pa Date paid sighted by Name of officer who sighted the form
assessment manager

 

 

 

 

 

 

 

 

 

Privacy Statement

The information collected on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of Information Act 1992) or
as required by Pariament. This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002.

 

 

 

Page 3

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_2087 - Preliminary Building Work Assessable Against the Planning Scheme [As Published].pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.