Council archive · source document
08/2087 - Preliminary Building Work Assessable Against the Planning Scheme [As Published] · 172008.2087
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
PAS Form 1 Development Application
Part E
Building &/or operational work assessable against a planning scheme
ae gts
4. Natyre of work that requires assessment against a planning scheme:
Building work - Complete Table A (1 Operational work - Complete Table B
Table A
(i), What is the nature of the building work made assessable in the planning scheme?
| Kopesep NEW peep y+ RETAINING while |
(ii) Are there any current approvals associated with this application? (e.g. material change of use)
(INo ‘es ~ Provide details below
; ___Ligt of approval réferencels. '|) ‘Date approved: “| Date“approval lapses (if know)
[ 4. EXTENSIONS y- ALTERATANS Jo Ex. RES
Table B
(i) What is the nature of the operational work made assessable in the planning scheme?
(Roadworks (Stormwater (2 Water infrastructure C1] Clearing vegetation under the planning scheme
DO Orainage works ([] Earthworks ( Sewerage infrastructure
(D Landscaping (2 Signage ( Other ~ Specify
(iii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers fo this question
would be different for different operational work, it may be more appropriate to provide these details in an attachment fo this form)
C1 Development Permit (7 Preliminary Approval (2 Both (Specity below)
L
(iv) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
[No (Yes - Specify the number of lots being created
(v) Are there any current approvals associated with this application? (e.g. Development Permit or Prefiminary Approval for MCU or reconfiguring a fot)
(No (71 Yes - Complete Table Ba)
Table B(a) | List of approval references: ____Date'epproved "| Datesapproval lapses (kno).
1.
2. What is the dotlar value of this operational work? (ie. the total vatue including GST, materials and labour) $
3. Confirm the following mandatory information accompanies this application
Confirmation of iodgemient | Method of lodgement:
Plans, aiid specifications if ai cab, showing the nature and, location ‘of the | 16d WOSKS: (inching the
tay oy specitati es ma. oe prone [a Confirmed Jtrn ONLY
OFFICE USE ONLY
Reacanmelate| Ieee, fe
een eeoney
Advice for completing Part E
General advice
« PartA must also be compteted for all IDAS development applications.
« The applicant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question.
ai | A development permit authorises development to occur, while a preliminary approval is a stsp in the approval process and does not authorise development to occur.
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/2087 - Preliminary Building Work Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.