Skip to the record
Accept no substitutions.

Council archive · source document

08/2087 - Preliminary Building Work Assessable Against the Planning Scheme [As Published] · 172008.2087

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

PAS Form 1 Development Application

 
    

Part E

Building &/or operational work assessable against a planning scheme

  

ae gts

4. Natyre of work that requires assessment against a planning scheme:
Building work - Complete Table A (1 Operational work - Complete Table B

 

Table A
(i), What is the nature of the building work made assessable in the planning scheme?

| Kopesep NEW peep y+ RETAINING while |

(ii) Are there any current approvals associated with this application? (e.g. material change of use)
(INo ‘es ~ Provide details below

; ___Ligt of approval réferencels. '|) ‘Date approved: “| Date“approval lapses (if know)
[ 4. EXTENSIONS y- ALTERATANS Jo Ex. RES

 

 

 

 

 

 

 

 

 

 

Table B

(i) What is the nature of the operational work made assessable in the planning scheme?
(Roadworks (Stormwater (2 Water infrastructure C1] Clearing vegetation under the planning scheme
DO Orainage works  ([] Earthworks ( Sewerage infrastructure
(D Landscaping (2 Signage ( Other ~ Specify

(iii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers fo this question
would be different for different operational work, it may be more appropriate to provide these details in an attachment fo this form)

C1 Development Permit (7 Preliminary Approval (2 Both (Specity below)

L

(iv) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?

 

 

 

 

 

[No (Yes - Specify the number of lots being created
(v) Are there any current approvals associated with this application? (e.g. Development Permit or Prefiminary Approval for MCU or reconfiguring a fot)
(No (71 Yes - Complete Table Ba)
Table B(a) | List of approval references: ____Date'epproved "| Datesapproval lapses (kno).

 

1.

 

 

 

 

 

 

 

 

 

2. What is the dotlar value of this operational work? (ie. the total vatue including GST, materials and labour) $

 

 

   

3. Confirm the following mandatory information accompanies this application

 

Confirmation of iodgemient | Method of lodgement:

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

Plans, aiid specifications if ai cab, showing the nature and, location ‘of the | 16d WOSKS: (inching the
tay oy  specitati es ma. oe prone [a Confirmed Jtrn ONLY
OFFICE USE ONLY
Reacanmelate| Ieee, fe
een eeoney
Advice for completing Part E
General advice

«  PartA must also be compteted for all IDAS development applications.
« The applicant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to another question.

ai | A development permit authorises development to occur, while a preliminary approval is a stsp in the approval process and does not authorise development to occur.

 

 

 

 

Page 1

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_2087 - Preliminary Building Work Assessable Against the Planning Scheme [As Published].pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.