Council archive · source document
07/0198 - Approved plans [As Published] · 142007.198
Plans and drawings: the text below has words only, no drawings.
1.3m NOt TOBE COPE . INTERNATIONAL COASTAL WATMCUT APPRONA: « ¢ MANAGEMENT P.0.BOX 7196 PH. 07 5564 0564 GOLD COAST MAIL CENTRE FAX 07 5532 9147 AUSTRALIA 9728 EMAIL icm@coastaimanagement com au 3.6m 0 NOOSA RIVER SPIT EROSION PROTECTION WORKS for NOOSA SHIRE COUNCIL Sand-filled Geotextile Container ; 0.2m allowance for settlement 1 2 SCALE As Shown DRAWN w. DATE APPROVED 4/7106 te 8 Corbett BE & ~<Ja-< aie temaane Notes 1. Alignment as per drawing NSC-01 2. Typical levels by Noosa Shire Council July 2006. 3. Tides [Noosa Beach} HAT = 1,06m AHD MHWS_0.62m AHD MLWS -0.80m AHD LAT — -1.12mAHD 4. Design Conditions [2%] Waves’ Hs = 0.75m Current = 2.5ev/s Storm surge = 1.8m 5, Geotextile to be ELCOMax 1200R or equivalent May be reinforced to provide improved vandal fesistance. Nominal size equivalent to "T1". 6. Inlet ports to be "screw and give” closures spaced at 10m intervals along the container. 7. The structure is designed to be flexible and any HAT MHWS erosion, placement of an additional container on the shoreward side may be required. MLWS LAT Natural Surface Level eee inaHD pares! NOOSA SHIRE COUNCIL PLANS APPROVED SIGNATURE:... ern, DAT Eisesessssee (S08 (OF srsse OCPWORKS OF Jig 3 4 5m REVISIONS DRAWING N°” REV. NRS-03 SUBMERGED PROJECTION TYPICAL X-SECTION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0198 - Approved plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 574 KB (small file)
- File type
No other editions are linked here.