Council archive · source document
07/1967 - Operational Works - Landscaping [As Published] · 142007.1967
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 °
‘St :. 'x| 2. The application involves: (tick applicable bores).
[1()) development on land contiguous to a ‘State controlled road and for - -
(1 (@) material change of use assessable against the planning scheme;
(11 (b) reconfiguring a lot unless -
« the total number of fots is not increased; and .
« the total number of lots abutting the State-controlled road is not increased;
C1 (o) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
* associated with access to a State-controlled road; or
* for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
+ pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
71 (ii) development on land not contiguous to a State-controlled road and -
(1 (a) material change of use -
* assessable against the local government's planning scheme; and
¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule; /
(0 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
* assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
& ti none of the above
The application involves: ick coplcoble boxes
LI (i)_ material change of use -
(a) assessable against the planning scheme;
(b) on a lot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
OC (ii) reconfiguring a lot- .
{a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
{c} where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Dili) operational work -
" (a). for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
(iv) none of the above,
The application involves: :
(J (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
~ Act) - complete Part { of Form 1
C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part i of Forn 1
&) (il) none of the above
4 Land contiguous to a State-controlted road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controlled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1967 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.