Council archive · source document
07/1967 - Operational Works - Landscaping [As Published] · 142007.1967
- 17. The application involves: : (ick the applicable boxes)
IDAS Assessment Checklist, Version 20, 2 April 2007
~ CU reconfigur figuring ‘a lot for which all of part of the premises are ~
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 —
« item 5, including the exemption otherwise provided for by paragraph (d);
+ item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
Ci (i) a material change of use -
{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
{b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
none of f the at above
00
16. Thé application involves: tick the senlcabl box/es)
CI (i) reconfiguring a lot where any part of the lot is -
+ subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
¢ situated within 100m of a substation site;
Ci) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
C1 (ii) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
Li (iv) operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
© any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
« the work is located wholly or partly within 10m of a substation site;
wl (v) none of the above.
we eg a et
19. Does the application involve development assessable against the planning scheme and on nland
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
{iii) other than development -
(a) for the designated purpose; or
{b) carried out by, or on behalf of, the designator.
I No
OyYes
Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1967 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.