Council archive · source document
07/1967 - Operational Works - Landscaping [As Published] · 142007.1967
. INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
Table J
Nature of State-owned resource
Nature of evidence required
Allocatior/entitlement a vei State Goverment Date of | Date of
N
reference number lame of authorising officer } Position of authorising officer Department issue | expiry
| GENERATE ANOTHER TABLE |
11. Does the application involve land other than State-owned land (Le. privately owned land) and require owner's consent?
0), No
wa Yes - Complete Table K and submit, with the application, written documentation of all owner's consent
Table K
@ Owner name/s , Street address or lol on plan description Date written consent was obtained
ft. TREMEZ2Z0 PIV CTD. © : aN File .
Mandatory attachments and supporting Information . . Lenses
12. What are the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and
e supporting Information accompanying this application, not identified in those other form parts?
Oescription of attachment or information . Tile (if appicable)
(e.g. Part C of Form 1, owner's consént, evidence of (e.g. General Authority, James Street . Date Meinod Of detvery to
resource allocattorventitlement, plans, drawings, reports) Traffic Repo) __Bssessment manager
(. [PART & BY HAND.
preteen
‘Portabie Long
cae ver ve cern pey eaeaty ec inte heme ett tie ne eating oe meant at ame mem Tat ree ap
rice Leave (PLSL, ley for building and construction work
oom ne ad Bote eB
13. Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit
for the application can be given?
OO No
© 13(a) Indicate the reason PLSL is not applicable.
(The application is not for building and construction work under the Building and Construction Industry (Portable
Long Service Leave) Act 1991, section 3AA (e.g. the appiication is only for a change of use ar for the following types of
work carried out solely for farming purposes: lend clearing, site preparation, earthworks, fences, fodder harvesting.
clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); or
‘ (Cs Allcosts, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(The work is being carried out under an owner-builder permit issued under the Queensland Building Services
@ Authority Act 1991 - Complete end submit a QLeave Notification and Payment Fonn (no payment required if owner-builder permit
me number stated). The receipled form must be sighted by the assessment inanager before a development permit can be given.
Yes
13(b) Has the PLSL levy been paid?
LY No - Compiete and submit a QLeave Notification end Payment Form. The receipted form must be sighted by the
assessment manager before a development permit can be given.
oO Yes - Complete Table L and submit, with the application, the *yellow’ (Local Government's (Council) / Private Centifier's)
copy of the receipted QLeave Form.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1967 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.