Original source · versioned page text
Town Planning Report_Bunnings Trade Centre_v3.3
REPORT 5 LEGISLATIVE REQUIREMENTS 5.1 Assessment Manager In accordance with Schedule 8 of the Planning Regulation 2017, the assessment manager for this application is Noosa Shire Council. 5.2 Categories of Assessment The table below summarises the categorising instruments and categories of assessment applicable to this application. Table 10: Categories of Assessment Aspect of development Categorising instrument Category of assessment Development Permit for Material Noosa Plan 2020 Code Assessment Change of Use for Hardware and Trade Supplies Overlays Noosa Plan 2020 No change This application does not require public notification as it is subject to Code Assessment. 5.3 Referrals In accordance with Schedule 9 and 10 the Planning Regulation 2017, no referrals are triggered in association with this application. 102995-10 | Bunnings Trade Centre | 3.3 | 30 March 2022 rpsgroup.com Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.