Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2018-11-12 General Committee Meeting Notes

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                  12 NOVEMBER 2018


GENERAL COMMITTEE MEETING - LIVE RECORD MEETING NOTES
12 NOVEMBER 2018 – Crs. Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson, Joe
Jurisevic, Frank Pardon and Brian Stockwell, Tony Wellington


1   MCU18/0102 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE
    FOR VISITOR ACCOMMODATION TYPE 4 CONVENTIONAL (122 BEDS) AT 16 MARY
    STREET, NOOSAVILLE
    Committee Recommendation
    Moved:             Cr Stockwell
    Seconded:          Cr Jurisevic
    That Council note the report by the Coordinator Planning to the Planning & Environment
    Committee Meeting dated 6 November 2018 regarding Application No. MCU18/0102 for a
    Development Permit for Material Change of Use - Visitor Accommodation - Type 4
    Conventional (122 beds) situated at 14-16 Mary Street Noosaville and defer consideration
    of the matter to the Ordinary Meeting dated 15 November to allow staff to bring forward a
    further report with amended conditions of approval to include conditions which approve the
    height of the building as proposed by the applicant, allow operation of the internal pool and
    café area until 10pm at night, that condition the operation to install a sound monitoring
    system and 24hr onsite management to maintain statutory requirements in terms of noise
    nuisance and allow Council the opportunity to review compliance of that noise condition in
    12 months, and reduce the extent of acoustic fencing.
                                                                                         Carried.


2   NOOSA SPIT SHORELINE EROSION INVESTIGATION - SHORELINE EROSION
    MANAGEMENT PLAN
    Moved:           Cr Stockwell
    Seconded:        Cr Wellington
    That Council note the report by the Project Coordinator – Flooding, Coastal and Foreshore
    to the Services & Organisation Committee Meeting dated 6 November 2018 and support
    the completion of a Shoreline Erosion Management Plan for Noosa Spit and Noosa Main
    Beach subject to funding being provided in Budget Review 2.

    Amendment
    Moved:           Cr Pardon
    Seconded:        Cr Jurisevic
    That Council note the report by the Project Coordinator – Flooding, Coastal and Foreshore
    to the Services & Organisation Committee Meeting dated 6 November 2018 and support
    the urgent completion of a Shoreline Erosion Management Plan for Noosa Spit and Noosa
    Main Beach subject to funding being provided in Budget Review 2.
                                                                                     Carried.




                                                                                   Page 1 of 13
Log in to download the original file

2018-11-12 General Committee Meeting Notes(PDF, 642KB).pdf · 657 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.