Original source · versioned page text
2022-06-16 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 16 JUNE 2022
Bushfire Management – Reconfiguration Requirements
42. All reconfiguration works must be carried out in accordance with the approved Bushfire
Hazard Assessment and Management Plan.
*(Refer Advisory Note)
43. Certification must be submitted to Council from a qualified person* which certifies that
the development has been constructed in accordance with the bushfire management
conditions of this Decision Notice.
*(Refer Advisory Note)
44. The following clauses must be included in the contract of sale for all Lots which requires:
a. future dwellings to be constructed within the building envelopes shown on the
Approved Plans AND in accordance with the approved Bushfire Hazard
Assessment and Management Plan.
b. the trafficable fire break trail to be maintained, include unlocked 4m wide gates
allowing access to Council and Fire Services and ensure compliance with the QLD
SPP Bushfire 2019 firebreak trail specifications.
c. All future dwellings are to provide a dedicated 10,000 litre water supply for
firefighting purposes.
45. A Landholder Bushfire Information Kit is to be provided to all new owners detailing the
performance requirements of the trafficable firebreak fire trails
Road & Park Names
46. The proposed names of roads must be lodged with the application for a Development
Permit for Operational Works. Names are to be
a. Relevant to Australian, preferably local, history, flora, fauna, culture, landscape or
physical characteristics.
b. If used, personal names should commemorate persons who have contributed
significantly to the development of the region; demonstrated outstanding levels of
civic service; or achieved role-model status in the wider community or donated
property or funds for community benefit; and be recognised in memoriam.
c. Park names should be unique within the locality.
d. Approval will not be given to a name that may be construed as advertising, is more
than one word, understanding that a geographic relationship such as Cooroy
Mountain is permissible; is insensitive to diverse cultures and does not accord with
community standards; and is not concise, easy to pronounce and spell and be
without accent marks, apostrophes or hyphens.
e. Approval will not be given to a name that is the same or similar to the name of
another road in the Shire, or of a road in close proximity in a neighbouring Shire.
Names that are not easily pronounced, or may cause confusion to emergency
services are to be avoided.
f. All street signs on new roads (public and private) and parks shall be erected prior
to works being accepted on maintenance.
Boundary Encroachments
47. Certification must be submitted to Council from a Licensed Surveyor which certifies that:
a. the setback/s to any new boundaries for any existing buildings remaining on the
site comply with the relevant provisions of the planning scheme and the Building
Act 1975, unless varied by this Decision Notice.
b. all constructed access and roadworks (including associated fill batters and
Page 24 of 49
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.