ORDINARY MEETING AGENDA 16 JUNE 2022
d. table drains and culvert drainage generally in accordance with drawing No. 21598-
P002, Revision C prepared by TOD engineers and the approved flood investigation
Condition 50 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Property Access and Driveways
51. A residential driveway must be constructed to all lots in the relevant stage. The works
must be undertaken in accordance with an Operational Works approval and:
a. be generally in accordance with drawing No. 21598-P002, Revision C prepared by
TOD engineers and
b. be generally in accordance with Council’s Standard Drawing RS-056 and any
associated addendum
c. include the access driveway servicing Lots 3 & 5.
52. The existing vehicle access to McKinnon Drive is to be wholly removed and the area
revegetated as part of these works.
53. Vehicle access to Lots 1 - 8 is limited to the constructed driveway only. A clause must
be included in the contract of sale for Lots 1 - 8 which requires vehicle access to be from
the constructed driveway only, and which prohibits the driveway from being relocated
without Council agreement.
The following property notation, or similar, will be added to Council’s rates records for
Lots 1 – 8:
Private Certifiers, owners and prospective purchasers are notified that special access
requirements apply to this parcel of land. Contact Council's Planning Department for
Details.
54. Vehicle access to Lots 1 to 8 is limited to Glenridge Drive and the new road only. A clause
must be included in the contract of sale for Lots 3 and 4 which prohibits vehicle access
being taken from McKinnon Drive.
The following property notation, or similar, will be added to Council’s rates records for
Lots 3 and 4:
No vehicle access is permitted to this property from the McKinnon Drive.
Stormwater Drainage
55. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Services
56. Underground reticulated electricity and telecommunication services must be provided to
Lots 1 - 7 in accordance with the standards and requirements of the relevant service
provider.
57. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
58. Certification must be submitted to Council from all relevant service providers (Energex
and NBN) which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements
59. Easements for drainage purposes must be registered in favour of Council against the
title of all lots. The easements must fully contain those parts of the subject site below the
1%AEP flood level.
Page 26 of 49