Skip to the record
Accept no substitutions.

Original source · versioned page text

Town Planning Assessment Report (1)-compressed

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

3.4 LANDSCAPING

Established vegetation will be maintained. New landscaping will be provided to complement the
proposed development in accordance with a rural landscape master plan currently being developed by
Conlon Group Landscape Architects.

3.5 INFRASTRUCTURE AND SERVICES

Waste collection will be provided as per previous arrangements.

The site can be connected to electrical and telecommunications. The existing water tank and effluent
disposal area is sufficient to service the proposed development. An On-site effluent disposal report will
be prepared by Australian Soil Investigations and their site inspection has confirmed that the site has
amble area to effectively treat sewerage onsite in accordance with Council requirements.




                                                                                                       8
Log in to download the original file

Town Planning Assessment Report (1)-compressed.pdf · 658 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.