Skip to the record
Accept no imitations.

Original source · versioned page text

Planning Report 2281 - AllStar Metal Fab

Attached to the e-mail HBB Type 3 Significant Scale - MCU17/0546.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                   proposal report




the existing shed will not compromise the safety of people or property from the bushfire hazard
consistent with the Specific Outcome.

Agricultural Land Conservation

The 4 ha site is located within the good agricultural land conservation area and triggers assessment
against the Natural Resources Overlay Code. The relevant Specific Outcomes of the Code seek for
new uses that permanently alienate agricultural land from production are not located within the
Agricultural Land Conservation Areas.

The existing business is located within the existing 360m2 workshop building and is not located next
to any existing farms. The shed size is akin to a rural machinery shed and does not fragment, alienate
or diminish the site’s future use for agricultural productivity. As a result, the proposed use is
consistent with the relevant Outcomes of the Overlay Code.

Infrastructure

The site is connected to all existing infrastructure services including:

      -   Existing tank, bore and dam water on the site.
      -   Existing above ground electricity supply within the Boronia Rd frontage.
      -   Existing onsite effluent disposal system, which is capable of servicing residents and staff.

The existing development does not impact on the capability of infrastructure services and utilities,
consistent with the relevant Outcomes of the Business Use and Locality Codes.


5.0 State assessment and other matters

5.1 State interests
5.1.1 Matters established in the Planning Regulation

Nil

5.1.2 State Planning Policy

The SPP includes assessment benchmarks that may be applicable where a local government
planning scheme does not adequately reflect the SPP. The following assessment benchmarks are
applicable and have been appropriately considered in preparing this development application:

 State interest                          Assessment against assessment benchmark
 Bushfire Hazard                         The State Planning Policy requires any material change of use within a
                                         bushfire hazard prone area mitigates the risks to people and property to
                                         an acceptable or tolerable level. The workshop is within the potential
                                         bushfire hazard buffer area and more than 50m away from the existing
                                         vegetation to the north.
                                         Considering the large buffer area from the vegetation, access to the site
                                         outside of the buffer, the availability of water son the site, the temporary
                                         use of the shed to daytime hours, and the ability to manage staff to
                                         ensure the use mitigates the risks to people and property.



                 martoo consulting
                 town planners + urban designers + development managers                                  page 10 of 11
Log in to download the original file

Planning Report 2281 - AllStar Metal Fab.pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.