2 David Low Way - Attachment 6 - UXO Assessment - OPEC
Attached to the e-mail Reconfiguration of a Lot (1 lot into 6) - RAL17/0501.
OPEC - 2 David Low Highway, Castaways Beach
Rev 02 – AFU – 10 Aug 2017
The primary objectives of this EO/UXO Risk Assessment were as follows:
Determine the extent to which the Site may be contaminated by military ordnance including
but not limited to:
o explosive ordnance (EO);
o unexploded ordnance (UXO) or abandoned explosive ordnance (AXO);
o explosive ordnance waste (EOW);
o hazardous explosive ordnance components (fuses, etc); and
o hazardous explosive ordnance constituents (residual chemicals, etc).
Provide preliminary advice regarding:
o the nature, location and extent of such contamination;
o the EO/UXO risks faced by the Client; and
o mitigation of risks associated with EO/UXO.
METHODOLOGY
CONDUCT OF THE ASSESSMENT
The EO/UXO Assessment of the Site was conducted in line with AS/NZS ISO 31000:2009 ‘Risk
Management - Principles and Guidelines’ and UXO industry norms which included:
desktop research to identify military activities that occurred in or near the site (units,
timeframes, weapons systems, munitions, etc) – including but not limited to:
o examination of records held by Dept of Defence, Australian War Memorial,
National/State Archives, Qld Govt and other sources;
o obtaining local information; and
o examination of topographic and land use data;
desktop research to identify UXO reports and UXO investigations;
plotting, recording and analysis of all relevant material to:
o identify military activities that may generate munitions-related hazards, and
o determine the possible locations, magnitude and nature of EO contamination;
analysis of the interaction between potential munitions hazards and the Client’s (or other
users’) activities to quantify UXO risks (risk assessment); and
analysis of measures to mitigate or reduce risks to an acceptable level.
Important This Assessment is based on incomplete information – conclusions & recommendations
given herein may significantly change if additional information becomes available.
For use only in relation to the specified project
© 2017 Copyright BOZ Technical Services Pty Ltd Page 8 of 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.