                                                                                                                                                               WATER SUPPLY NETWORK WORKS                             GENERAL NOTES                                             WATERMAIN NOTES
                                                                                                                                                                                                                      1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE
                                                                                                                                                               1.    ALL DESIGN OF WATER SUPPLY NETWORK WORKS             WITH CURRENT SOUTH EAST QUEENSLAND WATER              ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH
                                                                                                                                                               SHALL BE IN ACCORDANCE WITH THE WATER SUPPLY               SUPPLY CODE SPECIFICATIONS AND STANDARDS.             CURRENT SEQ WATER SUPPLY CODE SPECIFICATIONS AND
                                                                                                                                                               CODE OF AUSTRALIA, SOUTH EAST QUEENSLAND SERVICE       2. UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND           STANDARDS.
                                                                                                                                                               PROVIDERS EDITION VERSION 1.3 (AUGUST 2019), PART 1:       WORK SHALL COMPLY WITH THE RELEVANT
                                                                                                                                                               PLANNING AND DESIGN AND PART 3: DRAWINGS.                  AUSTRALIAN STANDARDS.                                 UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK
                                                                                                                                                               2.                                                     3. ADOPT LIP OF KERB OR SHOULDER OF ROAD AS               SHALL COMPLY WITH THE RELEVANT AUSTRALIAN
                                                                                                                                                               3.    ALL CONSTRUCTION OF WATER SUPPLY NETWORK




                                                                                                          W
                                                                                                                                                                                                                          PERMANENT LEVEL.                                      STANDARDS.




                                  W
                                                                                                                                                               WORKS SHALL BE IN ACCORDANCE WITH THE WATER            4. COVER ON MAINS FROM PERMANENT LEVEL TO BE AS
                                                                                                                                                               SUPPLY CODE OF AUSTRALIA, SOUTH EAST QUEENSLAND            SHOWN IN SEQ-WAT-1200-2.                              ADOPT LIP OF KERB AS PERMANENT LEVEL.
                                                                                                                                                               SERVICE PROVIDERS EDITION VERSION 1.3 (AUGUST 2019),   5. CONDUITS TO BE INSTALLED IN ACCORDANCE WITH
                                                                                                                                                               PART 2: CONSTRUCTION AND PART 3: DRAWINGS.
               T
                            IN
           UM CR                                                                                                                                                                                                          THE STANDARD DRAWINGS.                                COVER ON MAINS FROM PERMANENT LEVEL TO BE AS
                     ATER MA




                                                                                                      W
                                                                                                                                                                                                                                                                                FOLLOWS;
                              W
                                                                                                                                                                                                                      6. A WATER METER SUPPLIED AT THE DEVELOPER'S
                                                                                                                                                               4.    ALL PRODUCTS AND MATERIALS USED IN                   COST, IS TO BE INSTALLED AT THE SERVICE POINT OF           90, 125 & 180 NOMINAL DIAMETER PIPE - 600mm
                                                                                                                                                               CONSTRUCTION OF WATER SUPPLY NETWORK WORKS                 EACH LOT IN ACCORDANCE WITH THE STANDARD                   200, 315 & 355 NOMINAL DIAMETER PIPE - 1000mm
                         CW


                                                                                                                                                               SHALL BE IN ACCORDANCE WITH THE SOUTH EAST                 DRAWING FOR THE SEQ-SP.
              G


                                                                                                                                                               QUEENSLAND CODE ACCEPTED CIVIL INFRASTRUCTURE          7. ALL MATERIALS USED IN THE WORKS SHALL COMPLY
         GHOST
                100Ø uPV



                                                                                                                                                                                                                                                                                CONDUITS TO BE INSTALLED IN ACCORDANCE WITH THE




                                                                                                  W
                        W




                                                                                                                                                               PRODUCTS AND MATERIAL LIST, AND THE MOST RECENT            WITH THE SEQ-SP's ACCEPTED PRODUCTS AND
                                                                                                                                                                                                                          MATERIALS LIST OR BE APPROPRIATELY SHOWN,             STANDARD DRAWINGS.
                                                                                                                                                               VERSION OF THE LIST IN EFFECT AT THE DATE OF THE
                                                                                                                                                               CONSTRUCTION PRE-START MEETING.                            LISTED AND DEFINED IN THE ENGINEERING
             EXISTING




                                                                                                                                                                                                                          SUBMISSION SO THAT THE ALTERNATIVE PRODUCT OR         DEPTH OF HYDRANTS TOP BELOW FINISHED SURFACE LEVEL
                                                                                                                                                                                                                          MATERIAL CAN BE ASSESSED AND IF APPROPRIATE,          IS TO BE BETWEEN 75 AND 225mm.




                                                                                              W
                  W




                                                                                                                                                               5.    CONSTRUCTION WORKS SHALL BE SUPERVISED BY            APPROVED BY THE SEQ-SP.
                                                                                                                                                               AN ENGINEER WHO HAS RPEQ REGISTRATION. WORKS NOT       8. ALL CONCRETE FOOTPATHS TO BE CLEAR OF WATER            ALL WORK ASSOCIATED WITH LIVE WATER MAIN
     W                                                                                                                                                         COMPLYING WITH THIS REQUIREMENT WILL NOT BE                MAINS.                                                CONNECTIONS TO BE CARRIED OUT BY UNITYWATER AT THE
                                                                                                                                                               PERMITTED TO CONNECT INTO UNITYWATER'S WATER           9. TEST/CHLORINATION POINTS TO BE INSTALLED IN            DEVELOPERS COST.
                                                                                                                                                               SUPPLY NETWORK.                                            ACCORDANCE        WITH    STANDARD      DRAWING




                                                                                          W
                                                                                                                                                                                                                          NO.SEQ-WAT-1410-1.                                    DUCTILE IRON CEMENT LINED PIPES SHALL BE CLASS PN35




                                                                                                                   R ST
                                                                                                                                                                                                                      10. THE CONSTRUCTION OF THE WATER RETICULATION            AND FITTINGS SHALL BE PN16 AND COMPLY WITH AS/NZS
                                                                                                                                                               6.    ALL LIVE WORKS ASSOCIATED WITH THE WATER
                                                                                                                                                                                                                          WORK SHOWN ON THIS DRAWING MUST BE                    2280 AND AS 4087 AND COMPLY TO THE SEQ CODE




                                                                             IN
                                                                                                                                                               SUPPLY NETWORK SHALL BE CARRIED OUT AT THE
                                                                                                                                                                                                                          SUPERVISED BY AN ENGINEER WHO HAS RPEQ




                                                                         ATER MA
                                                                                                                                                               DEVELOPER'S COST BY QUOTATION REQUEST TO                                                                         ACCEPTED CIVIL INFRASTRUCTURE APPROVED PRODUCTS




                                                                                      W




                                                                                                                  BUTLE
                                                                                                                                                                                                                          REGISTRATION. WORKS NOT COMPLYING WITH THIS           LIST. COLOUR SHALL BE BLUE PE SLEEVING OR BLUE
                                                                                                                                                               UNITYWATER PRIVATE WORKS ONLY.
                                                                                                                                                                                                                          REQUIREMENT WILL NOT BE PERMITTED TO CONNECT          COATING.
                                                                                                                                                                                                                          TO THE RETICULATION SYSTEM.




                                                                              W
                                                                                                                                                               7.    THE CONSTRUCTOR SHALL VERIFY THE LOCATION                                                                  TRENCH BACKFILL MATERIAL SHALL CONSIST OF THE BEST




                                                                      200Ø AC
                                                                                                                                                               AND DEPTH OF EXISTING SERVICES WITH RELEVANT ASSET     ENVIRONMENTAL CONDITIONS                                  MATERIAL FROM TRENCH EXCAVATION, FREE OF ORGANIC




                                                                                  W
                                                                                                                                                               OWNERS AND AUTHORITIES BEFORE COMMENCING                                                                         MATTER, WITH PARTICLE SIZE NOT EXCEEDING 75mm.
                                                                                                                                                               WORKS.                                                 VEGETATION PROTECTION




                                                                  EXISTING
                                                                                                                                                                                                                      A. TREES LOCATED ALONG THE FOOTPATH SHALL BE,             THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND
                                                                                                                                                                                                                         TRANSPLANTED PRIOR TO CONSTRUCTION, OR                 ARRANGE TRENCH FILL COMPACTION TESTING TO BE
                                                                                                                                                               8.    PRIOR TO COMMENCEMENT OF ANY VARIATION                                                                     CARRIED OUT BY A NATA CERTIFIED TEST LABORATORY AND




                                                                          W
                                                                                                                                                               WORKS, THE CONSTRUCTOR MUST FIRST OBTAIN                  REPLACED IF DESTROYED.                                 SHALL BE IN ACCORDANCE WITH SEQ WS&S D&C CODE,
                                                                                                                                                               APPROVAL FROM THE REGISTERED MAJOR CONNECTIONS         B. WHEN WORKING WITHIN 4m OF TREES, RUBBER OR             PART WSA03-2011 V3.1 -19.3.1, 19.3.2.1 & 19.3.2.5
                                                                                                                                                               CERTIFIER.                                                HARDWOOD GIRDLES SHALL BE CONSTRUCTED WITH
                                                                                                                                                                                                                         1.8m BATTENS CLOSELY SPACED AND ARRANGED               THE CONTRACTOR SHALL ARRANGE AN INDEPENDENT
                                                                                                                                                                                                                                                                                LICENSED SURVEYOR TO CARRY OUT A "WORKS AS


                                                                      W
                                                                                                                                                                                                                         VERTICALLY FROM GROUND LEVEL. GIRDLES SHALL BE         CONSTRUCTED" SURVEY AND SUBMIT THE DETAILS SHOWN
                                                                                                                                                                                                                         STRAPPED TO TREES PRIOR TO CONSTRUCTION AND            ON PLAN TO THE SUPERINTENDENT AT COMPLETION OF
                                                                                                                                                                                                                         REMAIN UNTIL COMPLETION.                               CONSTRUCTION. "WORKS AS CONSTRUCTED" TO BE
                                                                                                                                                                                                                      C. TREE ROOTS SHALL BE TUNNELLED UNDER, RATHER            PROVIDED IN THE FORMAT REQUIRED BY THE SERVICE
                                                                  W


                                                                                                                                                                                                                                                                                PROVIDER (UNITYWATER).
                                                                                                                                                                                                                         THAN SEVERED. IF ROOTS ARE SEVERED THE
                                                                                                                                                                                                                         DAMAGED AREA SHALL BE TREATED WITH A SUITABLE          THE CONSTRUCTION OF THE WATER MAINS WORK SHOWN
                                                                                   W                                                                                                                                     FUNGICIDE. CONTACT RELEVANT COUNCIL ARBORIST           ON THIS DRAWING MUST BE SUPERVISED BY AN ENGINEER
                                                                                                              W
                                                                                                                                                                                                                         FOR FURTHER ADVICE.                                    WHO HAS RPEQ REGISTRATION AND AN ACCREDITED
                                                              W




                                                                                                                          W                                                                                                                                                     UNITYWATER CONSTRUCTION CERTIFIER. WORKS NOT
                                                                                                                                                                                                                      D. ANY TREE LOPPING REQUIRED SHOULD BE
                   LOCATION OF WORKS                                                                                                                                                                                     UNDERTAKEN BY AN APPROVED ARBORIST.
                                                                                                                                                                                                                                                                                COMPLYING WITH THIS REQUIREMENT WILL NOT BE
                                                                                                                                                                                                                                                                                PERMITTED TO CONNECT TO THE RETICULATION SYSTEM.
                                                                                                                                                                                                                      SOIL
                                                          W




                                                                                                                                                                                                                      A. TOPSOIL AND SUBSOIL SHALL BE STOCKPILED
                                                                                                                                                                                                                         SEPARATELY.
                                                                          WW                                                                                                                                          B. CARE SHALL BE TAKEN TO PREVENT SEDIMENT FROM
                                                                                                                                                                                                                         ENTERING THE STORMWATER SYSTEM. THIS MAY
                                                                                                                                                                                                                         INVOLVE PLACING APPROPRIATE SEDIMENT CONTROLS
                                                                                                                                                                                                                         AROUND STOCKPILES
                                                                      LOCALITY PLAN                                                                                                                                   CREEK CROSSINGS
                                                                      NTS                                                                                                                                             A. SILTATION CONTROL MEASURES SHALL BE PLACED
                                                                                                                                                                                                                         DOWNSTREAM OF ANY EXCAVATION WORK.
                                                                                                                                                                                                                      B. APPROPRIATE SEDIMENT CONTROLS SHALL BE USED
                                                                                                                                                                                                                         TO PREVENT SEDIMENT FROM ENTERING THE CREEK.
                                                                                                                                                                                                                      C. NO SOIL SHALL BE STOCKPILED WITHIN 5m OF THE                                         D       05.04.23 FOR APPROVAL                                           TJ     SR
                                                                                                                                                                                                                         CREEK.
                                                                                                                                                                                                                                                                                                              C       13.03.23 FOR APPROVAL                                           DG     SR
                                                                                                                                                                                                                      REHABILITATION
                                                                                                                                                                                                                      A. PREDISTURBANCE SOIL PROFILES AND COMPACTION                                          B       07.12.22 FOR INFORMATION                                        DG     SR

                                                                                                                                                                                                                         LEVELS SHALL BE REINSTATED.                                                          A       08.11.22 FOR INFORMATION                                        DG     SR

                                                                                                                                                                                                                      B. PREDISTURBANCE VEGETATION PATTERNS SHALL BE                                          ISSUE DATE                       AMENDMENT                              BY    APP
                                                                                                                                                                                                                         RESTORED.                                                                                 COPYRIGHT: THIS DESIGN AND PLANS ARE NOT TO BE USED OR REPRODUCED

                                                                                                                              ALL WORKS ON EXISTING WATER MAINS TO BE CARRIED                                                                                                                                                 WHOLLY OR IN PART WITHOUT WRITTEN PERMISSION OF MPN
                                                                                                                                                                                                                                                                                                                              CONSULTING PTY LIMITED 2018 ©


                                                                                                                              OUT BY UNITYWATER PRIVATE WORKS AT THE
                                                                                                                              DEVELOPER'S EXPENSE
                                                                                                                                                                                                                                                                                                              ABN: 39 062 191 799                                             P: 61 7 3335 4555
                     DEVELOPMENT DETAILS                                                                                                                                                                                                                                                                      39 Sherwood Road, Toowong, Qld, 4066                   E: [email protected]


                                                                                                                                                                                                                                                                                                              CLIENT:
NAME OF ESTATE                        5 LOT SUBDIVISION                                                                       ALL WATER AND SEWER CONSTRUCTION WORK SHALL




                                                                                                                                                                                                                                                                                       NOT FOR CONSTRUCTION
                                                                                                                                                                                                                                                                                                               ENDEAVOUR FOUNDATION
                                                                                                                              COMPLY WITH ALL APPLICABLE WORKPLACE HEALTH
                                                                                                                              AND SAFETY LEGISLATION                                                                                                                                                           1 INTO 5 LOT SUBDIVISION
   STREET                             83 BUTLER STREET
                                                                                                                                                                                                                                                                                                               83 BUTLER STREET TEWANTIN
                                                                                                                                                                                                                                                                                                               QLD, 4565
   SUBURB                                   TEWANTIN                                                                                                        UNITY WATER
                                                                                                                                                ACCREDITATION & CERTIFICATION SCHEME
                                                                                                                                                                                                                                                                                                                               WATER RETICULATION
   FILE REF.                                                                                                                        WATER APPROVAL REF. NUMBER:    -                                                                                                                                                              COVER SHEET
                                                                                                                                             ACCREDITED ENTITY:    MPN CONSULTING PTY LTD                                            CONSULTANT: MPN CONSULTING PTY LTD
  DELEGATE                                 UNITYWATER                                                                                                                                                                                                                                                         DESIGN: DG             DRAWN:      DG          SCALES:       AS SHOWN
                                                                                                                                                                   (ACR / AE 2021-069)                                               CONTACT: LACHLAN STEPHENSON                                              CHKD:       SR         APPRD:      LS          DATE:         05.04.23

APPROVAL DATE                                                                                                                                REGISTER CERTIFIER:   SHAUN SWENSON (ACR / MAJ 2021-082)
                                                                                                                                                                                                                                     (RPEQ 16903)                                                                 mpn JOB              DRAWING No.                                         REV
                                                                                                                                                                                                                                     TELEPHONE: (07) 3335 4595
                                                                                                                                                     SIGNATURE:
                                                                                                                                                                                                                                                                  DATE   05.04.23
                                                                                                                                                                                                                                                                                                                9279 WR.0.01   D
                                                                                                                                               CONTACT DETAILS:    07 3335 4505
                                                                                                                                                                                                                                                                                                                  FOR APPROVAL
Log in to download the original file

Att 4 Sewer and Water for information.pdf · 3.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.