Council archive · source document
Landscape Plans ISSUE5_14.12.22 (1) · OPW22/0319
Plans and drawings: the text below has words only, no drawings.
UNIT 5 UNIT 6
Retaining wall to architects
detail
Refer planting plan 2 of 3
for understorey planting
details to side boundary
gardens
JOINS BELOW
Terrace Terrace
Clothes
line
Retaining wall to architects
detail
Refer planting plan 1 of 3 Open Open Clothes
line
& plant schedule for trees Space Space
3 GRE OM +
6 BAE vir
7 DIA Jes
RP Boundary 6 HIB sca - (groundcovers)
Stormwater pits above rear of allotment
retaining walls to capture neighbouring site
runoff (refer civil)
Private courtyards planting detail D - Units 5 & 6 16 SYZ Res
to boundary line within retained garden bed +
9 CAL LJ
9 DIA Jes
9 MYO par - (groundcovers)
UNIT 7 UNIT 8
Refer planting plan 2 of 3
for understorey planting
details to side boundary
garden
Terrace Terrace
Refer planting plan 1 of 3
JOINS ABOVE
Clothes & plant schedule for trees
Clothes line
line
Open Open
Space Space Retaining wall to architects
detail
RP Boundary Landscape planting plan 3 of 3
3 GRE OM +
6 BAE vir 16 SYZ Res
7 DIA Jes to boundary line within
6 HIB sca - (groundcovers) retained garden bed +
9 CAL LJ
PROPOSED DEVELOPMENT-
9 DIA Jes Prepared by
Private courtyards planting detail D - Units 7 & 8 9 MYO par - (groundcovers)
Refer sheet 6 for plant schedule
25-27 TOOLAR STREET TEWANTIN,-QLD
PAGE 5 of 6
Landscape plans ISSUE 5: December 14, 2022
[OCR of page images]
~
Retaining wall to architects
detail =
ai
Refer planting plan 2 of 3
for understorey planting
details to side boundary
gardens
JOINS BELOW
Retaining wall to architects
detail
Refer planting plan 1 of 3 _
& plant schedule for trees
ws
3 GREOM+
6 BAE vir
7 DIA Jes
6 HIB sca - (groundcovers)
J, 3 » R STR) :
ve > > :
Stormwater pits above rear of allotment
retaining walls to capture neighbouring site
Private courtyards planting detail D - Units 5 & 6 TSSVZRes thin retained garden bed + runoff (refer civil)
OIA Jes
9 MYO par - (groundcovers)
UNIT7 UNIT 8 2
|_| = ——| Refer planting plan 2 of 3
ie") i { Wey \| TUM for understorey planting
{ M Rit i details to side boundary
4 é 7 Th Th oz Wah 4 sae os ~ | garden
/ a i 1 ‘ i v )
i (MIA Te Ti I | Xt 4 --) ii i | FF \| { . ;
y | { } xt) f t TY \ (| : _ | Refer planting plan 1 of 3
9 | yy ) . } } | e & plant schedule for trees
3 i | i Cy DAHLE
2 +18 yi
S } i) iT A
{ I, \ ain Regalbing wall to architects
" etai
7 —_—— Pa = Dirac : - Landscape planting plan 3 of 3
hot Oe EG tees! ee,’ ~ 0 1 2 3 4m
2 GREOM + 16 SYZ Res .
7DIA Jes to boundary line within Seale 1:100 43
6 HIB sca - (groundcovers) retained garden bed +
9 DIA Jes Prepared by
Private courtyards planting detail D - Units 7 & 8 9 MYO par - (groundcovers) PROPOSED DEVELOPMENT
Refer sheet 6 for plant schedule 25-27 TOOLAR STREET TEWANTIN, QLD
PAGE 5 of 6
Landscape plans ISSUE 5: December 14, 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Landscape Plans ISSUE5_14.12.22 (1).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.