Council archive · source document
Further RFI - Attachment A - Proposed Plan of Development (Updated Version B) · MCU20/0071
Plans and drawings: the text below has words only, no drawings.
8.0m height line
ridge 15.665
height ridge 15.465
6.54m height ridge 15.265
6.46m height
6.305m
prefabricated
roof trusses
4,265
living living
2,550
living
FL 11.40 FL 11.20 FL 11.00
garage
2,850
garage garage
natural ground line U3 FL 8.55
plotted from 3D
terrain model
U2 FL 8.35 U1 FL 8.15
long section A
BLOCK A
ridge 15.665
ridge 15.465 height
ridge 15.265 height 7.98m
8.0m height line
200
height 7.84m
7.71m
prefabricated
roof trusses
4,265
2,550
living living
living
FL 11.20 FL 11.40
FL 11.00
garage
2,850
garage garage
U5 FL 8.55 U6
FL 8.15 U4 FL 8.35
natural ground line
plotted from 3D
long section B terrain model
BLOCK B
Client Location Drawing Drawn Scale
SECTIONS AM 1:100@A3
THYNNE PROPERTY
24 MOORINDIL STREET
Project TEWANTIN Drawing no. Date
62 hilton terrace
noosaville (07) 5449 9066
[email protected]
QBSA reg. 65073
PROPOSED 6 UNIT
DEVELOPMENT
18.1219.5B MAR 2011 5B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further RFI - Attachment A - Proposed Plan of Development (Updated Version B).pdfRelated documentApplication case desk ↗
About this file
- File size
- 841 KB (small file)
- File type
No other editions are linked here.