Decision Notice - 010.2008.00002087.001 [As Published] · 172008.2087

of 6

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                       2008/2087



       Sheet 1 of 1                 Pool Deck Details – Clearwater Pty Ltd    November 2008

       and as may be amended by these conditions.
2.     A maximum of 25% of the area within 4.5 metres of the revetment wall is under hard
       pavement and the balance is to be turf or ground covers.
3.     A minimum of 25% of the area within 4.5 metres of the revetment wall shall be planted with
       shrubs. No shrubs are planted within 1m of the revetment wall
       Finished ground levels within 4.5metres of the revetment wall shall not exceed a slope of
       4.5:1.
4.     No tree species with a mature height of over 3m shall be planted within 4.5m of the revetment
       wall
5.     The ground surface within the first metre from the revetment wall is turf, ground cover or hard
       pavement.
6.     Any pool fencing or balustrading within 4.5m of the revetment wall is to be constructed of open
       construction or clear glazing.
7.     The Preliminary Approval for Building Works lapses if the works have not happened by 15
       January 2011, unless an application to extend the relevant period is approved by Council.

5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger             Referral Status    Referral Agency        Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.        Rev.    Plan / Document Name                      Date
 Sheet 4 of 7                       South West Elevation, North East          February 2008
                                    Elevation and Site Plan – Clearwater
                                    Pty Ltd
 Sheet 1 of 1                       Pool Deck Details – Clearwater Pty Ltd    November 2008

7      ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.     The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
       Local Law No. 12, prevents a builder or building contractor carrying out building work on a
       building site in a way that makes or causes audible noise to be made from the building work:-
       1.1.     On a Sunday or public holiday, at any time; or
       1.2.     On a Saturday or a business day, before 7.00am or after 6.30pm.
       1.3.     A maximum penalty of $1,500 applies to an offence under this legislation.



                                                                                      Page 2 of 6

Used in these records

About this file

File size
53 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00002087.001 [As Published].pdf · 53 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.