Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Additional Information regardng representations REC10/2072 MCU10/2116

of 2

Text shows just the words. Original shows the document exactly as it was published.

I




    stormwater connections and driveways. The plans detailing this work shall be
    prepared and certified by a suitably qualified registered professional engineer and
    submitted to Council to obtain for a Development Approval for Operational Works
    prior to the sealing of the plan of survey. All works must be completed prior to
    commencement of the use.

    As a consequence of the above amendment to Condition 4 the applicant requests
    that the Condition be deleted from the Development Permit for Reconfiguring a Lot
    and added to the Preliminary Approval for Multiple Housing Type 4 (6 units).


    I look forward to receiving a Negotiated Decision Notice in due course. Do not
    hesitate to contact me on (07) 5442 6121 if you wish to discuss any outstanding
    issues in relation to the representations made herein.

    Yours faithfully



    -"Z a 4t--
    Max L. Watterson

Used in these records

About this file

File size
215 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Additional Information regardng representations REC10_2072 MCU10_2116.pdf · 215 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.