4.0 SUMMARY
The proposed residential lots fronting the creek’s floodway will have at least metre of a freeboard to the
Year2100 1%AEP flood level and the proposed development will therefore be adequately flood-immune,
even with a 20% impost on the design rainfalls for future climate change.
The proposed stormwater detention facilities will be located outside the Year 2100 1% AEP flood
boundary and will therefore have no impact on the storage-routing capacity of the floodway.
The required 100 year stormwater detention volume of 398 cubic metres can be achieved, within the
site’s constraints, by two facilities – an open basin with 384 cubic metres of storage above the extended
bio-retention level and an oversized stormwater pipe with 22 cubic metres of nett detention capacity. A
more complex modelling procedure at the Operational Works stage, using the Bureau of Meteorology’s
2016 design rainfall data, could result in a slightly smaller detention volume. The 398 cubic metre volume
includes 128 cubic metres for no-worsening of the 1 year peak discharge to the downstream waterway,
as required for downstream waterway stability.
The open basin will have a 100 year water depth of 1.25 metres, or 1.05 metres above the extended bio-
retention level. The freeboard of 0.25 metres to the embankment crest will be sufficient to contain the
inflows from a greenhouse-induced 20 percent increase in storm rainfall intensities.
11
2035 2 Pearsons Road – Flood Study – Revision 2 Feburary 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.