Original source · versioned page text
2016-07-12 Planning & Environment Committee Agenda
The original of this document is very large (25.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JULY 2016 B. Approve application No. REC15/0022 for Reconfiguring a Lot (1 Lot into 2 Lots & Access Easement), subject to the following conditions: When Conditions Must Be Complied With 1. Unless otherwise stated, all works required by the conditions of this Decision Notice must be completed prior to submission of the subdivision plan to Council for compliance assessment. Approved Lot Reconfiguration Plan 2. The lot reconfiguration shall be carried out generally in accordance with approved plan No. 3049PROP titled Proposed Subdivision Lots 1 & 2 and Emt E in Lot 1 Cancelling Lot 30 on SP170751 123 Eumundi Road Noosaville by John Dawson Surveys Pty Ltd and dated 18/9/2015, subject to the following amendment: a. 2.0m x 2.0m truncation for the proposed dividing boundaries near the southeast corner of the proposed access handle. 3. All lot numbering on the subdivision plan to be submitted to Council for compliance assessment must remain as shown on the Approved Plans. 4. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. Easements 5. Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property. 6. All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee. Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms. Draft easement documentation must be submitted to Council for endorsement. 7. All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee. Vehicle Access 8. All vehicle access to proposed Lots 1 and 2 must be via the proposed access easement and a single shared access driveway in Eumundi Noosa Road. The driveway must be located generally in the same location as the existing driveway. Stormwater 9. The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval, and must include: 9.1. Stormwater system designed and constructed in accordance with Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks 9.2. No adverse impact on other properties and the road’s footpath and grassed verge (eg by diverting flows and/or blocking flows and causing additional ponding) 9.3. Where applicable, extension of the site stormwater system to accommodate stormwater from external site, including registration of drainage easements 9.4. The use of gravity stormwater drainage only and not surcharge pits or pumps. Page 74 of 185
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.