PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JULY 2016
General
3. Security in the form of a cash bond or trading bank guarantee to the sum of $100,000
must be submitted, to secure performance of all conditions of this approval, prior to
the commencement of Stage 1 of the development. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less any
costs incurred by Council in respect of enforcing performance of this permit.
4. The requirements of this development approval are to be effected, prior to the use of
the premises. Council reserves the right to call upon the bond or guaranteed sum
referred to in this approval to effect compliance with conditions.
5. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
off-site parking impacts, excessive noise, lighting nuisance or other emissions.
6. The requirements for the associated Reconfiguration of a Lot approval included in
this permit must be completed and Endorsement of the Plan of Survey by Council
must be obtained prior to any commencement of any use approved by this
Development Permit.
7. The Development Permit for a material change of use lapses if the use has not
commenced by 21 July 2020. The uncompleted aspects of this development
approval lapse if the whole of the approved use has not happened by 21 July 2024.
Staging
8. The development may be staged in accordance with the approved plan titled “Staging
Plan” CO-000-2014 Sheet 02/02 Revision H dated 13 November 2015 (as annotated
by Council) and as follows:-
8.1. The following works shall be undertaken and completed prior to the
commencement of use of Stage 1a:
8.1.1. All roadworks on the Main Road of Cooroy Connection Road (Elm Street)
including the upgrading works for the road intersections with Pearsons
Road, linemarking and pedestrian refuge crossing, as required by
conditions of this approval.
8.1.2. All frontage works including footpaths and landscaping for Trading Post
Road, Pearson Road and Elm Street as required by conditions of this
approval.
8.1.3. A Bus stop and shelter on the eastern side of Elm Street as required by
conditions of this approval.
8.1.4. A Bus stop and shelter on the western side of Elm Street as required by
conditions of this approval.
8.1.5. A pedestrian refuge crossing and lighting associated with the bus stop
pair on Elm Street.
8.1.6. All fencing to Trading Post Road and Pearson Road, and all acoustic
fencing to Elm Street as required by the approved Acoustic Report.
8.1.7. Landscaping treatments to open space areas associated with Stage 1a
including the establishment and rehabilitation of all detention basins, the
establishment of landscaping buffers to site boundaries and adjoining
residential properties and street trees.
8.2. The following works shall be undertaken and completed prior to the
commencement of use of Stage 4:
8.2.1. All roadworks, access and frontage works and landscaping for Lamonts
Road as required by conditions of this approval.
8.2.2. All fencing to Lamonts Road.
Page 78 of 185
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.