Council archive · source document
09/1624 - Operational Works - Detached House & Driveway [As Published] · 142009.1624
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 22
SECTI ON 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME. t= 4 pe ae
44 |s the proposed operational work assessable under any State planning regulatory provisions?
No :
- Ifno, is the proposed operational work assessable under the planning scheme?
TINo-Gotoas2 [4 Yes - complete Form 1, Part E end answer 04.1.1 — 4.1.7 below
0 Yes
ifyes, is the proposed operational work assessable under the planning scheme?
Q No — Answer Q4.1.1- 4.1.7
Yes — Complete Form 1, Part E and answer 04.1.1- 4.1.7 below
STATE-CONTROLLEDROAD fe: IAN ESBS Te OLS Oa
4.4.1 Is apy pait of the premises located in part of a future State-controlled road, or within 100m of a State-contolled road? ,
: No. . , . .
Ifo, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold? . .
OONo . O Yes - mis application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
OyYes : / . .
If yes, is all of the proposed operational work associated with either - ®
+ . Amaterial change of use that is assessable under the planning scheme; or [No [Yes
+ Reconfiguring a lot that increases the total number of lots,
€ , or increases the total number of lots
abutting the State-controlled road :
If mo - Answer (a) - (¢) below
{a) on of the proposed operational work associated with access to a State-controtled road?
No
Y@s - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency.
. . . . . ’
(b) Is any of the proposed operational work for filling or excavation? .
. P|
CINo (Yes : . ,
it yes, is the operational work proposed in a future State-controlled road not defined by route?
C No - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency
0 Yes- mis pplication must be referred to OMR as Advice Agency. ‘
(c} Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
Dino C1 Yes .
OW. is the operational work proposed in a future State-controlied road not defined by route?
No - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency.
| Yes - This application must be referred to OMR as Advice Agency.
Is any of the operational work proposed in a local
Development Involving Acid Sulfate Soils? _
LANo -cotoass3 Yes
rea listed4' in Stat
te Planning Policy 2/02: Planning and Managing
. _ If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
Cc No (Yes
Hf yes, does the proposed operational work involve the following?
* (i) Excavating more than 1,000ms of soil or sediment at or below 5m AHD
Ono (Yes
{ii) Filling the premises with 1,000mS or more of material with an average depth of 0.5m on [No (Yes
land, soil or sediment at or below 5m AHD
If yes to either or both (i) or (ii} above --This application must to be referred to the Department of Natural Resources and Water (NRW) as
. Advice Agency .
IP Reguiation. sefiedis 2 table 3, tans 4, State Planning Policy 2/02: Parsing aixi Managing Devers:
4 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Catfiope, Caloundra, Cardwell, Carpentaria, Cock, Cooloala, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday .
Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1624 - Operational Works - Detached House & Driveway [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.