INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

 

 

 

 

    

Witt eee ee ae

FWiel

 

oon. C) No- An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse fo receive it,
¥ .

Tata

ERWAY. BARRIER WO)

s apy of the operational work proposed to be carried out within a coastal management district? /
No-Gowas12 [Yes

If yes, is the proposed operational work for the following?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(i) __ Interfering with quarry material on State coastal land above high-water mark ONo | Yes

(i) Disposing of dredge spoil or other solid waste material in tidal water! : CI No |() Yes

(if) Draining or allowing drainage or flow water or other matter across State costal land above high-water CINo {£1 Yes
mark

(iv) Constructing or installing works in a watercourse where the works are not assessable under IPA, CiNo {C1 Yes
schedule 8, part 1, table 4, items 3 or 4 . . : a

(v) Reclaiming land under tidal watert. ‘ . Ono | Yes

(vi)_ Constructing ah artificial waterway, other than a canal, associated with feconfiguring alot Ono IE] Yes

(vii) Constructing an artificial waterway that is a canal, associated with reconfiguring a lott (No }E1} Yes

(viii) Constructing an artificial waterway not associated with reconfiguring a lot on land, other than State — (C1No jC] Yes

. coastal land, above high-water if the maximum surface area of water on the waterway Is at least 5,000m? | -

{ix) Constructing a bank or bund wall to establish a,ponded pasture on land, other than State coastal land, CINo |] Yes

| __- above high-water mark . .

(x) Removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion [No.}C) Yes
prone area and above high-water mark , .

 

If yes to one or more of (I) ~ (x) above, is any of the proposed work to be carried’out in a wild river area under the Wild Rivers Act
| 20052 * , : - of ’ 7.
oO No - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA Js not the Assessment
. Manager for the application, the agency has jurisdiction as Concurrence Agency. if yes, above, to any shown bold and marked with the symbol,
. the application also requires assessment by Queensland Transport (Marine Safety Qld) as Concurrence Agency. . .
OD Yes > 8 > > .
~ If yes, is all of the proposed operational work for specified works under the Wild Riveys Act 2005?.
Oo Yes.- Unless the pplication is consistent with any properly development ‘plan applying to the land, the Assessment Manager must refuse to receive i
(Complete Form 1, Part M) This apptication requires assessment by the Environmental Protection Agency (EPA). If EPA is not the Assessment .
Manager for the eppiication, the agency has jurisdiction as concurrence Agency. if yes, above, to any shown bold end marked with the symbol a, the
» application elso requires assessment by Queensland Transport (Marine Safely Qkd) as Concurrence Agency. Subject to the dectaration for the relevant
* wid river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005. .

schedule |, part 2 table 4, 4A Hx 5, Coastal Protection and Management

 

solsetide 2 lable 2 items 12 ane 14

GA,
ER’AREA::

 
   

     
  
 

IPA, schadise 8. part 4, tabla 4, item 5,17.
Act 1995 Act 1995, saction 104A (wild viv

IERWOR

Row

  

    

 

 

 

Ig any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
BJ No -covwonia - (1Yes . : . .
" IFyes, is any of the proposed operational work to be carried-out in a wild river area declared under the Wild Rivers Act 2005?
EJNo : : :

|f no, is all of the opérational work for constructing or taising waterway barrier works - tick applicable box/es and answer (a) and/or (b) betow

 

 

 

 

 

 

 

(i) temporary mi LYes
(ii) minor [No | CYes
(iti) rebuilt on a regular basis C1No OYes

 

(a) : If yes to one or more of (i) — (ill) above, does all the proposed operational work comply with any applicable Department
of Primary Industries and Fisheries (DPI&F) self-assessable code? : .
Y.es ~ A permit for that aspect of the operational work is not required. Go to 04.13 [INo- Go to( oF

(b) If no to alll of (i) - (iil) or no to'{a) above - (Complete Form 1, Part 0;) This application requires assessment by the Department of Primary
Industries and Fisheries (DPF). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

es
ne is any of the proposed operational work to be carried out in a wild river high preservation area?
No = Uniess the application is consistent with any property development plan applying fo the land, the Assessment Manager must-reluse to receive
‘t (Complete Form 1, Part Ox) This application requires assessment by the Department of Primary industries and Fisheries (DP/&F). and,
subject fo the declaration for.the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if DPI8F is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. . :
oO Yes -An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it

IPA, schedule 8, past | rable 4

 

 

 

Regutation, schedule 1. par 3.

 

 

 

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1624 - Operational Works - Detached House & Driveway [As Published].pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.