Council archive · source document
09/1624 - Operational Works - Detached House & Driveway [As Published] · 142009.1624
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
=: Pe ee eee
Is any of the operational rok proposed to be cared out in a wild 1 fiver area declared under the Wild River-Act 2005?
EXYNo-Gotoas1e (1Yes.
if yes, is the ‘proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
{i) Agricultural activities as defined under the Wild Rivers Act 2005 CI No Oves
(ii) Animal husbandry activities as defined under the Wild Rivers Act 2005 “CINo. C1 Yes
ILyes-to either (i) or {ii) above, is any part of the premises in the wild river high preservation area?
Yes - An application for the operational work will be taken to be not, properly made and the Assessment Manager must refuse to receive tt.
LI No . .
If no, is the proposed use in relation to the production of a high risk species as defi ned under the Wild Rivers Act 2005?
Oo Yes - An application for the operational work will be taken to be not property made and the Assessment Manager must refuse to receive it
0 No - Uniess the application is consistent with eny property development plan applying to the land, the Assessment Manager must refuse to
“receive it (Complate Form 1, Part Qif. agriculture. Complete Form 1, Part R # animal husbandry) Subject to the declaration for the
relevant wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schadure 3. part |, table 4, dem 19; iP Regutation, schedule 2 tahis 2 dem 34: Wid Rivers At 2005. sections 42. sh.
'STATE-CONTROLLED ROAD Pama eB
4,16 | Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled toad?
(yi No - End of sections [_] Yes
If yes, is the proposed operational work associated with either -
+ Amateria! change of use that is assessable under the planning scheme; or
~ * [INo (Yes
Reconfiguring a lot that increases the total number of lots, or increases the total number of lots
_ abutting the State-controlled road
{f no, and answers to questions in this section of the checklist indicate the proposed operational work is assessable under
. IPA, schedule & ~ Answer (a) - (c} below.
{a} Is Ne of the proposed operational work associated with access to a State-controlled road?
Yes - This @pplication must be referred to the | Department of Main Roads (DMR) as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation? ‘
CINo Yes
: ON is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads {DMR} as Concurrence Agency.
Oy Yes - This application must be referred to the DMR as Advice Agency.
(c)_ Does any of the proposed: operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
oO
No . [Yes @
If yes, Is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred fo the Department of Main Roads (DMR) as Concurrence Agency.
OJ Yes - This application must be referred fo the DMR as Advice Agency.
IB Regulation, schedide 2, lable 2. tam 3
Page 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1624 - Operational Works - Detached House & Driveway [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.