Council archive · source document
08/0176 - Response to Information Request [As Published] · 132008.176
Very large file (28.5 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Traffic Impact Assessment Report Settlers Cove Resort, Noosa Heads Cape Bouvard Investments Pty Ltd March 2009 7. PROPOSED CAR PARKING ARRANGEMENTS Parking has been provided within the site, at street level and also within the basement car parking areas. Drawing of the proposed car parking arrangements are attached in Appendix A. 71 Compliance with Noosa Council Requirements The development comprises of 202 resort apartments. The proposed development has made provision for 296 parking spaces, 7 of which are provided in tandem with 2 parking spaces provided within the site at street level, including one disabled parking space. Provision has been made for 51 visitor parking spaces (including one disabled space) and 3 staff parking spaces within the eastern basement car park. A secure parking area, via security gates, has accommodated 113 spaces within the eastern basement car park. A total of 127 spaces; 54 in the lower basement and 73 in the upper basement has been provided in the western car park. The total number of parking spaces provided is 296. The minimum number of spaces required by Noosa Council based on the proposed development is 222 spaces for the resort. It should be noted that the resort occupancy rate is more likely to be estimated at 90% which results in a reduction of parking spaces required for units to 200 spaces. An additional 45 spaces are required for the restaurant, requiring a total upper limit of 267 parking spaces within the development site. Whilst a requirement for the conference facilities has not been specified in The Noosa Plan is it considered appropriate to ensure additional parking is available for conference delegates who are not resort guests. Given the uses of the conference and restaurant, the visitor parking spaces can be utilised as multi purpose parking, with conference parking during the weekday and restaurant parking during the evening and weekend. The provision for 296 parking spaces complies with the requirement for guest accommodation and restaurant patrons. The additional parking spaces can accommodate staff and conference delegates. Therefore the proposed development complies with the requirements of The Noosa Plan. The secure basement car park has additional storage facilities within the staff amenities area, which can accommodate bicycle parking requirements for staff. Refuse collection for the apartments will occur on-street within the cul de sac head of Serenity Close. Accessibility for large trucks including front loading and rear loading can occur on-site via one forward manoeuvre and one reverse manoeuvre from Serenity Close. Refer to the Waste Management Report for further information regarding refuse collection. The occurrence of trucks servicing the site is considered infrequent and unlikely to significantly impact on the traffic flows within the cul de sac of Serenity Close. CHP yes Page 14 aa
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0176 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 28.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.