Council archive · source document
10/0627 M2358 Planning Report.pdf [As Published] · 152010.627
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
M2358
Page 14 of 43
March, 2010
Extract – MAP SEQKH4
―the site‖
Source: Department of Infrastructure and Planning
As shown in the extract above, the site is mapped as being within the Interim Koala Habitat
Protection Area. Table 1 of the South East Queensland Koala State Planning Regulatory
Provisions is reproduced in the extract below:
Extract – Table 1: Development in the Interim Koala Habitat Protection Area
Column 1 Column 2 Column 3
Development to which division Assessment criteria for Assessment criteria for assessable
3 does not apply assessable development development
1. Development for a private Having regard to the matters Development must:
residence on a lot. specified in schedule 3, 1. be consistent with the proposed
2. Development on premises development does not adversely biodiversity outcomes in a planning
that will result in: affect movement of koalas through scheme for the premises; and
(a) a gross floor area of no a koala movement corridor.
2. maximise opportunities for safe koala
more than 500m2; and movement through its design and
(b) the clearing of no more layout; and
than 2500m2 of native
vegetation; and 3. in accordance with a koala habitat
(c) the excavation or filling management plan, offset the loss of
of an area no more than mature koala habitat trees through
5000m2; and replanting koala habitat trees at a rate
(d) no loss of mature koala of 1 tree for every 1 metre height of
habitat trees. tree lost, occurring either:
(a) on-site; or if this is not possible;
3. Reconfiguring a lot that will (b) off-site.
not result in the creation of an
additional lot.
Source: Department of Infrastructure and Planning
As detailed in the extract on the previous page, a Koala Habitat Management Plan is required
for the assessment of this application. The Koala Habitat Management Plan is currently being
prepared and will be forwarded to the Council subsequent to the lodgement of this application.
In accordance with Schedule 7 of the Sustainable Planning Regulation 2009, this application is
required to be referred to the DIP as a concurrence agency.
Please consider the environment before re-printing this Development Application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0627 M2358 Planning Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.