Council archive · source document
10/0627 M2358 Planning Report.pdf [As Published] · 152010.627
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
M2131 – Bruna Sgualdino
Page 42 of 43
January, 2010
6.0 STATE PLANNING POLICIES
State Planning Policy 1/92 – Development and Conservation of Agricultural Land
Not Applicable.
State Planning Policy 1/02 – Development in the Vicinity of Certain Airports and Aviation
Facilities
Not Applicable.
State Planning Policy 2/02 – Planning and Managing Development involving Acid Sulfate
Soils
The proposal does not involve any excavation, therefore meeting the requirements of the
policy.
State Planning Policy 1/03 – Mitigating the Adverse Impacts of Flood, Bushfire and Landslide
Policy Principal Comment
FLOOD The land will be filled to ensure
1. Development maintains the safety of people on the development site from all the development site remains
floods up to and including the DFE flood free during a Q100 flood
2. Development does not result in adverse impacts on people‘s safety or the event.
capacity to use land within the floodplain.
3. Development minimises the potential damage from flooding to property on the
development site.
4. Public safety and the environment are not adversely affected by the
detrimental impacts of floodwater on hazardous materials manufactured or
stored in bulk.
5. Essential services infrastructure (e.g. on-site electricity, gas, water supply,
sewerage and telecommunications) maintains its function during a DFE.
BUSHFIRE The proposal provides sufficient
6. Development maintains the safety of people and property by: area to accommodate the
a) avoiding areas of High or Medium bushfire hazard; or bushfire buffer and trail as
b) mitigating the risk through: conditioned within the existing
Allotment design and siting of buildings; and Development Approval (Council
Including firebreaks that provide adequate: Reference: DA2007/1259).
setbacks between buildings/structures and hazardous vegetation, and
access for fire-fighting/other emergency vehicles;
providing adequate road access for fire-fighting/other emergency
vehicles and safe evacuation; and
providing an adequate and accessible water supply for fire-fighting
purposes.
7. Public safety and the environment are not adversely affected by the
detrimental impacts of bushfire on hazardous materials manufactured or
stored in bulk.
LANDSLIDE Not Applicable.
8. Development maintains the safety of people, property and hazardous
materials manufactured or stored in bulk from the risk of landslide.
Please consider the environment before re-printing this Development Application.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0627 M2358 Planning Report.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 15.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.