Skip to the record
The only place to find full transcripts.

Council archive · source document

10/0627 M2358 Planning Report.pdf [As Published] · 152010.627

of 102

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

100. A Waste Management Plan (demolition and construction) shall be submitted prior to
commencement of any demolition or construction works in accordance with Planning
Scheme Policy PSP77 - Waste Management Plans (see table below).

Waste storage areas are to provide for adequate separation of all reusable, recyclable
and waste materials. These shall be located so that they are convenient and safe to
use. (Refer to Council's Waste Management Code).

The Plan shall contain the following information:

100.1 The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.

100.2 A waste management table as indicated below is to be completed showing how
waste material is to be segregated — recycled — reused or disposed.

 

 

 

 

MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste | Estimated | On-site Off-site *specify
materials volume *specify proposed | *specify contractor and
(m*) re-use or on-site | contractor and | tandfill site or
recycling recycling outlet other disposat
methods site
Excavation
material

 

Green waste

 

Bricks

 

Concrete

 

Timber-please
specify

 

Plasterboard

 

Metals - please
specify

 

Asbestos

 

Other - please
specify

 

 

 

 

 

 

Note * If a demolition contractor is undertaking works, then the Waste Management
table is to be completed by the demolition contractor.

 

The purpose of the Waste Management Plan is to facilitate the segregation of waste for
the effective reuse and recycling of such materials. Additionally Council rewards those
who segregate waste by significantly reducing disposal fees at the landfill some items
are free. Higher gate fees are charged for loads of mixed waste.

 

 

 

Acoustic Amenity

101. Noise emission from mechanical equipment (air conditioners, refrigeration equipment
or poo! pumps etc) shall comply with the following requirements:

The equipment shall be installed and located in a manner that prevents excessive
noise in accordance with Council's Local Law No. 12 - Contro! of Nuisances.
Infringement Notices (on-the-spot fines) may apply for offences.

 

Used in these records

About this file

File size
15.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0627 M2358 Planning Report.pdf [As Published].pdf · 15.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.