Sunshine Coast Checklist - Applications Involving Land
Regional Council Development & Land Use Sections

 

IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1. APPLICATION FORMS
4.1. Form1 PartA

 

1.1.1 Ensure that the form is fully completed and is a current version.

 

\

 

 

1.1.2 In the case of an MCU or Op Works below the. high-water mark, owner's consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.

1.1.2.2  {f the owner of the land is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.

1.2 Form1 Part B-R Supporting Information

1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached. vows

   

1.1.2.1. Ensure that each of of Forms B-R which are attached are fully completed. __ _ ;

 

sos tM ee gm,

 

a @ Wo "DAS ASSESSMENT CHECKLIST; pO re
2.1. Ensure that relevant sections have been checked and/or completed with regard to referrals

 

2.2 Ensure correct parts of Form 4 are provided where required (ie most common are Part J for Y“

Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works)

3.. ENVIRONMENTALLY RELEVANT-ACTIVITIES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.1. Ensure that Part G is completed if EPA referral is required. . [
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Environmental Health for fees)
4. FORM.2 -REQUEST TO‘;CHANGE APPROVAL, -.. Bg eee late
4.1 Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records. ~|——7-
lf over multiple properties on one or more sites, consent of Body Corporate is required.
6 PLANS “3 7 oy wi oy ;
_ 5.1. Ensure that generally at least 6 sets of the Plan of Development 6 for Reconfiguration and Operational 23
©@ Works) accompany the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is [44
unbound.
6. -SUPPORTINGINFORMATION!?: = 05 8 8 eS “pbs testis a
6.1 Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration 1
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. LJ
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping te
7. FEE ae ee
7.4 Ensure that the application fee, as determined from the Council's adopted scale of fees, Lo
accompanies the apptication or has been paid. L-]

 

 

 

 

« Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works, Operational
Work if Jetty or if including Landscaping.

« Land Development Lot Reconfiguration applications and Operational Work not inciuding ‘Landscaping

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

NSC g:\anduse\administrative processes\application checklist.doc
Full text of the other 36 pages

Page 2

 

IDAS REFERRAL AGENCIES TRIGGERS (Most frequent referrals)
Please refer to IDAS Checklist for complete list

 

. «COMMENT

 

Piease tick
ons

 

Department of Main Roads (Concurrence or Advice)
« State Controlled Road

 

Dept Natural Resources & Water

e Acid sulphate soils (Advice)
e Clearing of native vegetation on freehold land (Concurrence)

 

Environmental Protection Agency (Concurrence)

« Contaminated land
* Environmental Management(Contaminated Land Register
* UXO
« Land recently used as a ‘notifiable activity’
« — Industrial land changed to sensitive uses (eg school)
« Coastal related development. .
« Koala habitat
« Wetlands (Advice only)

¢ Environmentally Refevant Activity (for non-devolved Council as EPA)

 

Queensland Transport (Concurrence)
° Railway
. Public Passenger Transport

 

Energex or other responsible entity (Advice)

. Electricity Easements/Substations

 

DIP (Concurrence)

. SEQ Regional plan

 

VARIOUS ,
. Conservation estate (Advice)

 

OTHER STATE AGENCIES +-TRIGGERS

x é WEE

 

 

 

 

.OWNER’S CONSENT (State land) - :

 

 

 

 

 

Department of Natural Resources and Mines

EPA

 

 

 

 

For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.

NSC g:\landuse\administrative processes\application checklist.doc

 

Page 3

13 Dolphin Crescent
Noosaville Queensland 4566
07 5473 0912 / 0413 920 443

 

16" August 2009
The CEO

Sunshine Coast Regional Council

PO Box 141 Tewantin, Qld 4565

Proposal to develop a Boat Ramp at 13 Dolphin Crescent Noosaville.

 

Dear Sir,

We are writing to submit a development application for a boat ramp at our residence at
13 Dolphin Crescent, Noosaville.

Accompanying this letter are detailed plans for the proposed development, a letter of
support from the neighbour adjoining the relevant property boundary, copies of the IDAS
application forms and checklist, a copy of the registered plan, evidence of ownership and
also evidence of support from both the Regional Harbour Master and Ecoaccess.

We are also enclosing a cheque for $1993 being the application fee of $1443 plus a
bond of $500.

We would greatly appreciate the increased amenity a boat ramp would provide at our
property. Our proposed works are supported by both MSQ and Ecoaccess and we hope
that you will also consider our application favourably.

Please let us know if you require any further information in support of our proposed
development.

Yours faithfully,

Sandy and Michael Guthrie

Page 4

Cory .

15 Dolphin Crescent

Noosaville
Queensland 4566
29" May 2009
To:
The Regional Harbour Master

The Environmental Protection Agency
Sunshine Coast Regional Council

Letter of support for proposed boat ramp development at 13 Dolphin Crescent Noosaville
Dear Sir / Madam,

We are the neighbours of Sandy and Michael Guthrie, the owners of number 13 Dolphin
Crescent, Noosaville.

It is our understanding that Sandy and Michael are applying to you for approval to
construct a boat ramp adjoining the boundary between our 2 properties.

We are writing to you to let you know that the proposed boat ramp will not prejudice our
own access rights and that we have no objection to it being located adjacent to our
property boundary.

We fully support the application.

Yours faithfully,

fowfbea —— _.

Tony and Margaret Paul.

Page 5

Queensland
Government

Maritime Safety
Queensland

12 June 2009
Sandy and Michael Guthrie : Queensland Transport
13 Dolhpin Crescent ,
Noosaville Qld 4566

Dear Mrs and Mr Guthrie

Tidal Works — Request for comments
Boat Ramp — Sandy and Michael Gutherie, 13 Dolphin Crescent, Noosaville.

Thank you for your letter of 4 June 2009 about your proposal to construct a boat ramp at the location
mentioned above.

As a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marine safety conditions are complied with.

1, The contractor must build the boat ramp according to John Norden & Associates, Drawing No
09/62-1, attached to your letter dated 4 June 2009.

2. The contractor must build the boat ramp totally within the approved quayline.

3. The structure must not impede the safe navigation of other ships or restrict safe access to or from
neighbouring structures.

4. Any obstructions and debris encountered during construction must be disposed of at your own
cost.

5. Any ships and equipment you or your agent use must comply with the 7ransport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995.

6. The contractor must construct the boat ramp within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional

Harbour Master.
Maritime Safety Queensland Our ref 710/01649(2) P39972 E32846 F25
Marine Operations (Brisbane) Your ref

MacArthur Avenue East Enquiries James O'Connor

Dinkanthe Nunnnatand anno

Page 6

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.

The above conditions must be included in your application to the assessment manager.
This agency will also forward a copy of this letter to the Assessment Manager.
Yours sincerely

Captain Richard C Johnson
Regional Harbour Master (Brisbane)

Page 7

 

 

Notice

Coastal development

Notice of decision — Provision of evidence of resource entitlement

 

This notice is issued by the Department of Environment and Resource Management pursuant to section 3.2.1 of the
Integrated Planning Act 1997 to provide resource entitlement as delegated under the Land Act (Tidal works and prescribed
tidal work) Delegation (No. 1) 2008.

Mr and Mrs Michael Guthrie
13 Dolphin Crescent
NOOSAVILLE QLD 4566

Dear Mr and Mrs Guthrie

cc: Queensland Primary Industries and Fisheries
Planning and Assessment (South)
PO Box 76
DECEPTION BAY QLD 4508

Our reference: CR2470; MCY2161

Re: Request for evidence of resource entitlement for the prescribed tidal works application for a new
boat ramp in Weyba Creek at 13 Dolphin Crescent, Noosaville, otherwise known as Lot 74 on
N10573, pursuant to section 3.2.1 of the Integrated Planning Act 1997, by Michael and Sandy

Guthrie

The Department of Environment and Resource Management, under the Land Act (Tidal works and prescribed :
tidal work) Delegation (No. 1) 2008, has considered your request received on 19 June 2009 and wishes to
advise you of the decision as specified below:

 

Michael John Guthrie

 

 

Property owner:
Sandy Lee Guthrie
Activity: Prescribed tidal work
Activity description: Construction of a new boat ramp

 

Plan / Drawing number:

Drawing no. 09/62-1 Amendment A dated May 2009, showing the site plan

 

Drawing no. 09/62-2 Amendment A dated May 2009, showing the longitudinal
section and revetment wall detail

 

Description of subject land:

 

 

13 Dolphin Crescent, NOOSAVILLE

 

 

 

Paae 1 of 2 + 080131

Page 8

ecoaccess

environmental licences and permits
Notice
Notice of decision — Provision of evidence of resource entitlement

 

Lot 74 Plan N10573

 

Decision: Evidence of resource entitlement is granted.

 

Decision Number: CSRE00454809

 

This decision is current for 6 | The evidence of resource entitlement can be used to support a development
months application for six (6) months from the date of this notice.

 

 

 

 

You are advised that all applications involving disturbance of marine plants require a development approval
from the Department of Employment, Economic Development and Innovation (IDAS Form.1 Part O2).

it is important to note that the provision of evidence of resource entitlement over State land means that the State
has no objection to the lodgement of the application for development approval. {t does not:

e imply approval of the development application; or
e affect functions the department may exercise as the assessment manager or a referral agency; or
e authorise a right to use and occupy land.

You may need to comply with the cultural heritage duty of care guidelines under the Aboriginal Cultural Heritage
Act 2003 and the Torres Strait Islander Cultural Heritage Act 2003, refer to the guidelines on
www.derm.qid.gov.au.

Hf you require more information, please contact Louise Pinn, the Project Manager, on the telephone number listed
below.

Yours sincerely

Bh. 2-[glo4

7

Signature . . : ‘ : . Date :
Dan Rose Enquiries:
Delegate ES - Reg Serv - Bne North - Sunshine Coast
Environmental Services - DERM
PO Box 168

Department of Environment and Resource Management COTTON TREE QLD 4558

Phone: (07) 5459 6132
Fax: (07) 5443 9927

Page 9

 

 

 

 

 

 

Notice

 

Integrated Planning Act 1997

Early Concurrence Agency Response

This notice is issued by the Department of Environment and Resource Management pursuant to Sections 3.3.2, 3.3.16
and 3.3.18 of the Integrated Planning Act 1997 to advise of a decision or action.

Mr and Mrs Michael Guthrie . cc:
13 Dolphin Crescent
NOOSAVILLE QLD 4566

Chief Executive Officer

Sunshine Coast Regional Council
Locked Bag 72

SCMC QLD 4560

Our reference: CR2470; MCY2161
Dear Mr and Mrs Guthrie

Re: Request for early concurrence response
The Department of Environment and Resource Management (DERM), wishes to advise that the request for
early concurrence agency response, received on 19 June 2009, has been assessed, and on 13 August 2009

a decision was made to issue a response for consideration of the assessment manager when the application
becomes properly made.

1. Property/Location:

 

 

Street Address 13 Dolphin Crescent
NOOSAVILLE QLD 4566
Lot/Plan Lot 74 Plan N10573

 

 

 

2. Detaiis of the recommendation

 

Activity (Referral Triggers)

Aspect of

Recommendation

DERM Decision

 

 

ramp

Operational Work

 

 

Development Number
Prescribed Tidal Work being Early Concurrence . , :
for construction of a new boat Response for Granted in full with IPCC01530509

conditions

 

 

 

 

Page 10

ecoaccess

environmental licences and permits
Notice

Early Concurrence Agency Response ©

 

3. Currency period

This approval will apse unless substantially started within the currency period/s set by the Assessment
Manager OR the standard currency periods stated in section 3.5.21 of the Integrated Planning Act
1997 applying to each aspect of development in this approval AND/OR the following currency periods
applying to aspects of development in this approval.

This approval wilt lapse unless substantially started within two years.

4. The approved plans

The approved plans and/or documents for this approval are:

 

 

 

Plan/Decument No. Pian/Document Name Date
09/62-1 Site plan Amendment A dated May 2009
09/62-2 Longitudinal section and revetment wall Amendment A dated May 2009
details

 

 

 

 

 

5. Codes for self-assessable development

Any self-assessable development for an environmentally relevant activity conducted in conjunction
with this approval, must comply with the relevant code of environmental compliance.

6. Assessment Manager Responsibilities

Please note that it is a requirement under Sections 3.5.15 and 3.5.17 of the Integrated Planning Act 1997
that a copy of the final Decision Notice (which includes DERM’s concurrence response) for this application
issued by the Sunshine Coast Regional Council, be forwarded to each referral agency. Therefore could you
please send a signed hardcopy to DERM's Ecoaccess Customer Service Unit, PO Box 15155 CITY EAST
4002 and an electronic copy to [email protected] addition, the State’s Native Title Work Procedures indicate that responsibility for assessment of native title
issues for an IDAS application rest with the Assessment Manager. Therefore in this instance, DERM has not
provided a notification to native title parties.

If you require more information, please contact Louise Pinn, the Project Manager, on the telephone number
listed below.

Yours sincerely

Enquiries:
ES - Reg Serv - Bne North - Sunshine Coast -
DERM

Dan Rose PO Box 168

Delegate COTTON TREE QLD 4558

Environmental Services Phone: (07) 5459 6132

Department of Environment and Resource Management Fay. (07) 5443 9927

Page 11

    
  
 

 
  

   
   

See

 

 

 

 

 

 

 

 

46 and 3.3.18 Integrated Planning Act 1997

SPORE,

DERM Permit’ number: _ 1PCC01530509

 

 

 

DERM Permit’ number: IPCC01530509
Assessment Manager reference: N/A
Applicant: Michael and Sandy Guthrie

Date application received by DERM: = 19 June 2009

Permit' Type: Early Concurrence Response for Operational Work
Date of Decision: 13 August 2009

Decision: Granted in full with conditions

Relevant Laws and Policies: Coastal Protection and Management Act 1995 and any

subordinate legislation

Jurisdiction: ftem 9 in Table 2 of Schedule 2 of the integrated Planning
Regulation 1998

 

Development Description

 

 

 

[Property ‘[Lotv/Plan Aspect of Development
13 Dolphin Crescent Prescribed Tidal Work being for construction of a

Lot 74 Pian N10573

NOOSAVILLE QLD 4566 new boat ramp

 

 

 

 

 

Reasons for inclusion of development conditions

In accordance with section 3.3.18(8) of the integrated Planning Act 1997 and section 27B of the Acts
interpretation Act 1954, the reasons for the inclusion of development conditions are:

The Department of Environment and Resource Management (DERM) is a concurrence agency under the
Integrated Planning Regulation 1998 for coastal management under the Coastal Protection and Management
Act 1995, excluding amenity or aesthetic significance or value. .

Additional information for applicants

The standard currency periods stated in section 3.5.21 of the integrated Planning Act 1997 or the nominated
currency period, apply to each aspect of development in this permit’. For information on when this permit’ takes
effect and the relevant currency periods, please see point 3 in the Early Concurrence Agency Response Notice.

* Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similar as
required by legislation administered by the Department of Environment and Resource Management.

 

Page 12

DERM Permit number: IPCC0153050t£

Contaminated Land

It is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land becomes aware
a Notifiable Activity (as defined by Schedule 2 of the Environmental Protection Act 1994) is being carried out on
the land or that the land has been affected by a hazardous contaminant, they must, within 30 days after
becoming so aware, give notice to the Department of Environment and Resource Management.

flee

Dan Rose

Delegate

Environmental Services .
Department of Environment and Resource Management

Page 13

DERM Permit number: IPCC01530509

CONDITIONS OF APPROVAL

General Permit Condition

Agency Interest: Coastal!

1

All works are to be constructed in accordance with the attached approved drawings and specifications
listed in the approved plans section in the Notice attached to this permit.

The chief executive administering the Coastal Protection and Management Act 1995 may order the
works to be removed or modified, within a reasonable time, if the works have or are likely to have a
significant effect on coastal management because the works:

(a) create a navigation hazard or other danger to the public; or -
(b) cause erosion or land degradation; or
(c) are unstable or have not been constructed according to the approved plans.

All reasonable and practicable measures must be taken to prevent pollution of watercourses or
stormwater systems as a result of silt run-off, oil and grease spills from machinery, concrete truck
washout and alike. Concrete agitator wash out must only be conducted in a specified area to facilitate
the removal of waste concrete from the area to landfill. Wastewater from cleaning equipment must not
be discharged directly or indirectly to any watercourses or stormwater systems.

Page 14

DERM Permit number: IPCC01530509

DEFINITIONS

Words and phrases used throughout this permit’ are defined below. Where a definition for a term used in this
permit’ is sought and the term is not defined within this permit’ the definitions provided in the relevant legislation
shall be used.

“approval” means ‘notice of development application decision’ or ‘notice of concurrence agency response’
under the Integrated Planning Act 1997.

“approved plans" means the plans and documents listed in the approved plans section in the notice attached
to this development approval.

"Department of Environment and Resource Management” means the department or agency {whatever
called) administering the Coastal Protection and Management Act 1995 or the Environmental Protection Act
1994.

“land” in the "land schedule” of this document means land excluding waters and the atmosphere.

"site" means tand or tidal waters on or in which it is proposed to carry out the development approved under this
development approval.

“watercourse” means a river, creek or stream in which water flows permanently or intermittently-

= in anatural channel, whether artificially improved or not; or
* in anartificial channel that has changed the course of the watercourse.

“waters” includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined
water natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the
sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater and any part-
thereof.

"works" or “operation” means the development approved under this development approval.

“you” means the holder of this development approval or owner / occupier of the land which is the subject of
this development approval.

END OF CONDITIONS

Page 15

INTEGRATED PLANNING ACT 1997

Part A, Version 3.1, 3 March 2008

idas)

 

 

Common details

OTE: Answer all questions untess directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.

 

“Applicant details (The Appicant is the person responsibie for making the application and need not be the owner of the land: The Applicant is responsible for ensuring the
Tinformation provided on the IDAS Application “orm is correct. This information is relied upon by the Assessment Manager and any referral agencies when assessing and
Tdeciding this apptication. By lodging this application, the Applicant incurs the ob&gations and responsibéties prescribed by the IPA, Any development permit or prefminary
‘approval that may be issued as a conscquence of this application wil be issued to the Applicant)

 

 

Company/organisation name (if applicable) |

 

Individual applicant/Contact person (If there is more than one applicant, provide additional applicant details on an attachment to this form)

Postal address [13 Dolphin Crescent Noosaville QLD 4566

 

Title

Lastname Guthrie

 

 

 

 

 

 

 

 

Contact telephone number {07 5473 0912 Mobile phone number 0414990708
Facsimile number | email address [email protected]

 

 

 

Title

First name

 

 

Last name

uthrie

 

Postal address

 

[13 Dolphin Crescent Noosaville QLD 4566

 

 

 

 

 

 

 

 

Contact telephone number 07 5473 0912 Mobile phone number 0413 920 443
Facsimile number [de mait address [email protected]
Details of the premises (ie. the tand on which the development is proposed - refer to the advice at the ond of the form) |

 

1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises)
Table A If the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.

 

[ Name of each local government area in which the mobile and temporary ERA is proposed to operate

[1
OR
Table B Street address for the premises (tick applicable box/es below and insert property description in the table. Identify each lot in a separate row.)

 

 

 

 

(i) q Street address / tot on plan for the premises (Appropriate for most applications including building applications); Of

(ii) [-] Street address /lot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon etc) (Note: Loton plan details may be oblained from title documents, a ‘Rate’ notice, or from the tocal government.)

 

 

 

unit | Steet Ses eaton a Local government area (e.g. Logan,
No. | No. Street Name and official suburbfocality name | Post Code | Lot No. Plan Number Caims)
1 13 Dolphin Crescent Noosaville 4566 4 N10573 ‘Sunshine Coast

 

 

 

 

 

 

 

 

 

Page 16

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

 

 

rable © ate and/or a map of the premises (Appropriate for development in remote areas, over part of a lot. in water (e.g. channel dredging in Moreton
— Coordinates
(Note: place each set of coordinates in a separate row) Zone Datum Local goverment area
Easting Northing Latitude Longitude | Reference Gf applicatie)
Le [aco
CO weses
(7) Other -

 

 

 

 

 

 

 

 

 

 

2. — Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete aniy if applicable)

Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)

 

Name of water body, watercourse or aquifer ir known)

 

[1 Weyba Creek

 

Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
7 Lot on plan description for strategic port jand . Port Authority for the lot
[i

Table F Complete if the premises are in tidal water

 

 

 

 

Name of local government for the tidal area (if applicable) Name of port authority for the tidal area (if applicable)
[1 [ Sunshine Coast Regional Counc Brisbane

 

 

 

 

 

3. Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)

 

Total area of premises

 

784.00 Dm? [) hectares (Tick applicable unit)

 

 

 

 

 

[Existing use of the premises ]
4. — Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, sevvice station, school, sugar cane farming etc.)

 

[1_ [Howe

 

5. Are there any existing easements on the premises? (e.g, for vehicular access, electricity, overland flow, water ctc.)?

BI No (7 Yes - Ensure the type, focation and dimensions of each easement are included in plans, submitted with the application
[Proposal details ]
6. _ Brief description of the proposal (e.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquacuture}

 

 

Construction of boat ramp

 

 

 

7, Does the poposal include new buildings or operational work (including any services) on the premises?
(No Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
(Resource entitlement (i applicable) - further information is provided in the advice section at the end of the form ]

 

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
invowes State land (leased and frechold), declared Fish Habitat areas, taking quarry material, taking of interfering with water under the Water Act 2000. ctc.)

oO No - Goto a9 Xl Yes - Complete Table G - provide detaits for each evidence required on a separate row, if applicable, Evidence of resource
allocation or entittement must be submitted with the application. You do not need to answer Q9 - go to the next section.

 

 

Nature of State-owned resource} 6. Land that is unaltocated State tand under the Land Act 1994, other than to the extent that item 17 applies

 

Evidence the dept administering the Land Act 1994 is satisfied-—(a) the development is consistent with an
Table G Nature of evidence required allocation / entitlement; or (b) the development application may proceed in the absence of an allocation /
entitlement

 

 

Allocation/entitlement { Name of authorising {Position of authorising) State Government Date of | Date of
teference number _Dfficer officer Department issue expiry

 

 

 

 

 

 

 

 

 

Page 17

INTEGRATED PLANNING ACT 1997 Parl A, Version 3.1, 3 March 2008
1
\Gremer’s consent (f applicable) - firthes information is provided in the advice section at the end! of the fora
9, Complete Tabte H for apptications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and

not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport infrastructure Act 1994 - provide detaits for each owner on a separate row, or on an attachment to this form if applicable.

 

 

 

 

 

 

 

 

 

 

 

 

Premises Owner's namels Details of the premises owned . . Date consent
and postal address (street adress or ton plan description) Owners signature was obtained

1 | Sandy Guthrie 43 Dolphin Crescent Noosaville Mou tine 27105/2008
4
2.

2 Michael Guthrie 13 Dolphin Crescent Noosaville Lel| ba 27/05/2009

Table H

 

 

 

 

 

 

 

 

 

 

* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .

 

[Attachments and supporting information (Complete Table! - Use a separate tow for each type af aitachment or information, inckiding information required
funder this Part) Please ensure all documentation submitted with this form, including other Parts of Form 1, or owner's consent, etc, are securely attached to this Part of the Form.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of attachment or information Title applic Method of defi
i plicable} le of delivery to
Table t feg. Pohcsnimenttionen pare are cetenee oat (eg. General Authority. James Street Traffic Report) Date assessment manager
1 | Covering fetter O4-Jun-2009 [mal
2 Neighbours support fetter 29-May-2009 | mail
3 Owners consent forms 27-May-2009 | mail
4 Copy of registered plan mail
+ 5 Engineer's plan of proposed development May 2009 mail
(Portable Long Service Leave (PLSL) fevy (Applicable for certain bulting and construction work valuod over $60,000 ony) J]

 

 

10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if applicable)
LJ the application seeks a preliminary approval only;

(C1 the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA {e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);

DX] all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
(J the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1997 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
No - End of Part A

(1) Yes - Answer Q12 below

 

OFFICE USE ONLY (For use by the Assessment Manager / Private Centifier) (Optional)

 

Receiving officer's Reference
name numbers

  

Fee ($) Date received

 

 

 

 

 

 

 

 

 

 

Foote sh Suppo dacurank dete LfEhr
Monte sede Qo suppur jeltey ofed r/oK4

Page 18

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

 

 

 

 

 

 

| NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER |
To: Council. | have been engaged as the private certifier for the building work referred to in this application.
Date of Name BSA Certticatio number | Builing classificationds
engagement

 

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)

 

 

Date receipted .
Description of the work QLeave Project Nurber Amount paid ($}| Date paid | Mm stghled by | Name of offoer who sighted the
ce _ manager
4

 

 

 

 

 

 

 

 

Privacy Statement

The information collected on Form 1 wilt be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information coflected will be retained as required by the Public Records Act 2002.

 

Advice for completing Part A

General advice

° Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.

 

 

 

° The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.

‘Applicant details

j~ If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.

Details of the premises

° The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other
structure is situated on the land). The term ‘tand' is also defined to include the estate in, on, over or under the land.

je Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete
Table A.

je The premises may be identified in a number of ways ~

Street address and lot on plan are most common and will apply to most applications,

« Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and tatitude and other
(specified) datum such as Zone Reference or GS84 may be provided.

° The definition of ‘water body' and ‘watercourse’ can vary from Act to Act.

° StrategicPortLandis within a local goverment area but a local govermment's planning scheme does not apply onStrategicPortLand.
StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on
strategic port land) and the Queensland Transport (Ports) website.

je “Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic
port land is defined in the IPA (schedule 10). Generally, the area below "high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, white the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the focal government tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).

 

 

 

 

Page 19

 

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

Resource entitlement

Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they invotve taking or interfering with a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the appfication. Link to Integrated Planning
Regutation. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be property made without the required evidence.

For appfications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as property made.
For State-controfled roads, a resource entitterent is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.

 

Owner's consent

Section 3.2.1(3) of the PA prescribes that an application must contain, or be supported by, the written consent of the land owners, if the
application involves: a material change of use; reconfiguration of a fot, work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994.
Evidence af this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the appfication or in the event of an appeal about the outcome of the application.

“Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
Teceive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.

 

Portable Long Service Leave (PLSL) Levy

The Building and Construction Industry Portable Long Service Leave Scheme provides tong service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland.

The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave) Reguiation 2002. included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.

The Building and Construction industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining tand.

The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued.

The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL fevy, Building and
Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.gleave.qld.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:

www. gleave.qid.gov.au )

 

 

Page 20

INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008

(tes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prescribed tidal work
‘Nature of the prescribed tidal works . |
1, What is the nature of the proposed prescribed tidal work and the type of approval sought? (Tick applicable box/es)
Nature of use Estimated value of 5
{Tick applicable box) |. completed works ($) Type of app roval sought
(7 Private use
i Jetty, pier or wharf .
Ot ety, per or wi (J Non-private use
[X] Private use
ii Boat ramp or spillwa ,000.00
i «i p or splay (J Non-private use 85
a (F Private use
iii Mooring pile X] Devel it Permit
CI i) oP (Non-private use evelopment Ferm
C1 (iv) Deck or boardwalk CPrivate use (| Preliminary approval
() Non-private use
(Private use
Pont
OW) ontoon (Non-private use
i a [] Private use
Vi Revetment, sea wall or retaining wall .
Ow) vem ng w [7] Non-private use
oO (vii) Other (e.g. abutment, basin, bridge, breakwater, dam,
dock, dockyard, embankment, groyne, pipeline or other |[—] Private use
underground service etc.) - Provide details below
(C1 Non-private use

 

 

 

 

 

 

 

 

 

2. — Is the application within a cul-de-sac, a bend in a waterway or other location where the side boundaries of the lot connected to the
work and neighbouring lots are not at right angles to the waterway?

 

I No
oO Yes - Submit, with the application, photos of any constructed neighbouring structures, or information about approved but unconstructed
neighbouring structures.
‘Adjoining property access and evidence of support |

 

3. Is the application supported by evidence that the proposed work will not prejudice the access rights of adjoining property owners?
(J) No Bd Yes - Complete Q3(a)

3{a) What is the nature of the evidence?

DX] Letters of support from adjoining property owner - Submit, with the application, the letters of support.
(J) Plans illustrating a water allocation area - Submit, with the application, the plans illustrating the water allocation area.

Page 21

INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008

 

(Certification J

4. Has a Registered Professional Engineer of Queensland (RPEQ) or interstate equivaient certified that the works comply with the design
and safety provisions of the State IDAS code for Prescribed Tidal Works contained in the Coastal Protection and Management

 

 

 

 

 

 

Regulation 2003?

{No

1X] Yes - Provide details below

Name of RPEQ or equivalent John A Norden

RPEQ No. or equivatent 1089

Contact mailing address PO Box 205 Tewantin QLD 4565
(Contact telephone number 07 5449 7137

Contact facsimile number 07 5449 7172

Reference number of all plans to which this certification relates 09/62-1

 

 

 

 

[Mandatory information |

5. Confirm the following mandatory information accompanies this application.

 

Confirmation of

lodgement

oO Plans aitd written ‘documentation ~~ ais ot ne : 2 Mata seem,

(i) The location and dimensions of the proposed tida! work in relation to the tot/s abutting the proposed
work and the tidal land on which the work is proposed to be located

Method of lodgement

 

 

 

&X] Confirmed mail

 

 

 

(ii) All other structures on the waterfront and within 20 metres of the proposed works DX] Confirmed mail
(iii) The current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide (HAT) and P

Mean High Water Springs (MHWS) [x] Confirmed | mail
(iv) The slope angles of the beds and banks of the tidal area DX] Confirmed

 

(v) Details of the proposed work in accordance with the IDAS code for prescribed tidal work in the
Coastal Protection and Management Reguiation 2003, schedule 4A (e.g. physical appearance, lighting, Confirmed —_ | mail
signage, earthworks, public access, infrastructure, structural components, engineering design standards)

 

 

 

 

 

 

 

 

 

 

 

(vi) The finished levels of the proposed works kK Confirmed mail
(7) Confirmed
(vi) Details of the largest vessel, if any, to be moored at the structure
[EX] Not appticabte
(vii) Evidence that the proposed work will not prejudice the access rights of adjoining property EX) Confirmed mail
owners [_] Not applicable
O OFFICE USE ONLY

 

 

 

 

Date Received Reference Numbers [ti‘CSCSC‘C*@OY EPA cost code | 433061

 

 

 

 

Page 22

INTEGRATED PLANNING ACT 1997 Part P, Version 2.1, 3 March 2008
Advice for completing Part P

 

General advice

Part A must afso be completed for all (DAS development applications.

The applicant is responsible for answering afl questions fully and correctly, untess following a response there is a statement to go directly to another
question.

When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) use the process from the information sheet Electronically
paying fees to the Environmental Protection Agency (EPA) and attach the form Electronic Funds Transter (EFT) payment notification to the application.
For further information about completing this form go to:

. 10; fe ibed tidal

. Egoaccess website

. EPA Guidelines and procedural guides

 

Qi

‘A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise
development to occur.

 

Q4

 

‘A Registered Professional Engineer of Queensland (RPEQ). or the interstate equivaient, may certify that the proposed work complies with the
design and safety provisions of the IDAS code for prescribed tidal work in the Coastal Protection and Management Regulation 2003, schedule
4A. The provision of the certification may reduce the applicable fee for assessment of the work by the local goverment.

 

 

Page 23

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

idas)

 

 

Assessment Checklist

 

DAS Development Application Form 1 is the approved form for all development applications under the Integrated Planning Act
1997 IPA). Form 1 is made up of various Parts.

Part A (Common details) of Form 1 must be competed for all applications. The retevance of other Parts of Form 1 depends on
the nature of the application.

Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.

Section 1 and ail other relevant sections of the IDAS Assessment Checklist, as identified in the Table betow, must be
completed for all development applications except those proposed on land in an urban development area, or for building work
requiring assessment against the Building Act 1975 only.

| For more information about development applications on land in-an‘ urban development area; refer to www.uida.qld.gov.au.”
For more advice about building applications refer to Part 8 of the IDAS Application Form.

 

 

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. if
unsure, phone or visit your local government or log onto the DIP website www.dip.qid.gov.ay for help

For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist

 

 

Does the application seek approval to make a material change of use of the premises?
ifyes - complete Section 2 of this checklist

Does the application seek approval to reconfigure a lot?
ifyes - complete Section 3 of this checklist and Part F of DAS Application Form 1. If the premises are completely within a single | Yes |K)No
focal government area assessment is by the local government.

(Does the application seek approval to carry out operational work?

OYes |INo

 

 

 

 

if yes - complete Section 4 of this checklist Rives |CINo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Cyes |p4No
if yes - complete Section 5 of this checklist

Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?

if yes - complete Section 6 of this checklist DYes |INo

 

Does the application seek approval to carry out building work requiring assessment against a loca! government planning
scheme? Ges |CINo
if yes - complete Form 1 Part E of IDAS Application Form 7. Assessment is by the local government.

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?

 

 

if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. OYes {No
[Assessment is by a building certifier

Do you wish the application to be assessed against a superseded planning scheme?

if yes - complete Form 1 Atachment 7 ClYes |BNo

 

ls the application for development completely or partly on Cairns and Mackay airport land under the Airport Assets
{Restructuring and Disposal) Act 2008?

tyes - Assessment is by the Department of Infrastructure and Planning. Complete Form 1 Part D of IDAS Application Form 1 ifthe |L1Yes |iNo
application is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the
local government as Advice Agency.

 

 

 

 

 

Page 24

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22

BECTIO: ! 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.

 

 

 

 

[ERITAGE }
1.4A ls any part of the proposal intended to be carried out on a Queensland heritage place under the Queensiand Heritage Act 1992?
[XJNo-cowr78 =] Yes

IPA scneduic & part 1 lable £ tern 2 IP Reguisiion schedule 2 table 2 tem 15

11B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Caims or Mackay airport land?

[XI No-Gotoa12 [_] Yes

JPA schedule 8 part 1 tabie 5 ey 2A IP Reculanen schedie 1 pan ? iapie 3 tem 2

 

[REMOVING QUARRY MATERIAL; WILD RIVER AREA ]

4.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
[X] No-Gotoar3 [[] Yes

JPA, schedule 8, part 1, lable 5, tem 1: iP Regulation, schedule 2. table 2. item 11; IP Regulation, schedule 1. table 5, item 2 (wild river area); Water Act 2000,
section 966C; Wild Rivers Act 2005, section 43A

 

[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA |

 

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

(X) No-Gotoars [_] Yes

IPA, schertule 8. part 1, table 2, tem 1: IPA, schedule 8, part 7, table 5, tems 3 and 4; IP Regulation, schedule 2, table 2, tems 1 and 23; Frvronmental Protechon Act 1994, section
73AA (wild river area); Wild Rivers Act 2005, section 43A; relevant wild river declaration; Wild Rivers Code

 

 

 

 

WITHIN THE L&MITS OF A PORT |
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

EX] No - Gotoa1s

CL Yes

IP Regulation, schedule 2. table 2, tems 75 and 16

[DECLARED FISH HABITAT AREA ]
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

LX] No - Goto a1.6

(1 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

JP Regulation, schedule 2, table 2, item 26

ICOMMUNITY INFRASTRUCTURE

 

 

16 ls any part of the premises designated for community infrastructure?
1X] No -Got0a1.7
DD Yes
IP Regulation, schedule 2, table 3, item 7
(WASTE WATER MANAGEMENT ]

 

17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[X] No - nd of Section: [_] Yes
IP Requiation, schedule 2, table 3. tom 5

Page 25

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklis, Version 22

 

SECTION! 4 - Section 4 must be completed when the application seeks approval fo carry out operational work.

 

 

 

 

(PLANNENG SCHEME |
44 Is the proposed operational work assessable under any State planning regulatory provisions?
[INo && Yes

If yes, is the proposed operational work assessable under the planning scheme?
(TI No- Answer a4.1.1-4.1.7 [KJ Yes - Complete Form 1. Part E and answer 04.1.1 - 4.1.7 below

 

|STATE-CONTROLLED ROAD
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?

{J No [[] Yes

if no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
[X] No -Go10 04.1.2
(D Yes - his apptication must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 3; IP Regutation, schedule 2, table 3, item 1(b)

 

‘ACID SULFATE SOILS

4.1.2 |s any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing

Development Involving Acid Sutfate Soils
&X] No -Got0.04.1.3 1] Yes

41 purukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Cattiope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,

Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

IP Regulation, schedule 2, table 3, item 4; State Planning Policy 2/02: Planning and Managing Development involving Acid Sulfate Soils, section 3.6

j

 

(EASEMENTS AND SUBSTATIONS
4.1.3 Is any of the proposed operational work for filling or excavation?
EX] No -Gotoa4.14

CO Yes

IP Regulation, schedule 2, table 3 item 10(a); IP Regulation, schedule 2, table 3, item 70(b)

4.1.4 {s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the

Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
IK) No -Gotoa415 [Yes
JP Reguiation, schedule 2, table 3, item 17

 

IPUBLIC PASSENGER TRANSPORT

4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the

specified threshold?
[X] No- Gotoas.1.6 — [[] Yes - This application must be referred to QueensiandTranspont (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, tem 14

 

IRAILWAY SAFETY AND EFFICIENCY

4.1.6 Is any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the

specified threshold?
[XJ No-Gotoa41.7 — [_] Yes - This application must be referred to QueenstandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 15

 

|KOALA CONSERVATION (outside SEQ urban footprint)

4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?

[IX] No -Gotoasz {] Yes

IP Requiation schedule 2, table 3, tem 19

Page 26

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checktisi, Version 22
WILD RIVER AREA - Although fegislation provides for assessment of operational works for residential, commercial and industrial

development for the purposes of the Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Wild Rivers
‘code to that type of development.

 

 

(ASSOCIATED Will RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
IAREA
42 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?

[XI No -Gowos3 (J Yes

IPA, schedule 8, part 1, lable 4. tem 2, IP Regulation, schedule 1, pen 2 table 5. wer itc)
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, indusinal or commercial development mside a designated uiban
area)

 

 

 

 

IKOALA CONSERVATION (Inside SEQ urban footprint) |

4.3A 1s any part of the premises in an interim koala habitat protection area?

[J No -Gotoas3s (_] Yes
IP Reguiation, schedule 2, table 2, item 34A

 

 

\VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA |
43B Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

{I No -Gowass ([] Yes

IPA, schedule 8, part 1, table 4, tems 1A-1G: IP Regulation, schedule 2. table 2, item 5 (vegetation clearing): 1? Reguiation, scheduie 2, table 2, tem 34 (koala
conservation); IP Regulation, schedule 1, part 3, table 4, item (vegetation clearingAwild river area}: Vegetation Management Act 1999, section 22A (vegetation
clearing/vald river area); Wild Rivers Act 2005, sections 31F and 43A

  

 

|TAKING OR INTERFERING WITH WATER; WILD RIVER AREA ]

4.4 ts any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?

DXI No -Gotoass [_] Yes - Answer (a) and (b) below

IPA, schedule 8, pan 1, table 4, tems 3{a). IP Requiation, schedule 2, table 2. tem B.1P Regulation, schedule 1, part 3, table 4, tems 3 and 3A, Water Act 2000, section 966A {vald nver
area), Wild Rivers Act 2005, section 43A: relevant wikd nver deciaration Wild Rivers Code

4.5 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
& No Goto 04.6 Oo Yes - (Compiete Form 1, Part Ky) This application requires assessment by the Department of Natural Resources and Water
{NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

IPA, schedule 8, part 1, table 4, item 3(b): IP Regulation, schedule 2, fable 2, item 8; IP Reguiation, schedule 1, part 3, table 4, item 3
Wild Rivers code (Note: the code does not currently contain applicable provisions for taking or interfering with artesian water)

4.6 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
DX] No -Gotoas.7 [_] Yes - Answer (a) and (b) below
IPA, schedule 8, part 1, table 4, item 3(c){i), IP Regulation, schedule 2. table 2, tent 8; IP Regidation, schedule 1, part 3, lable 4, tem 3; Water Act 2000. suction 966A {wild rrver area):
Wild Rivers Act 2005. section 43A, relevant wild nver declaration; Wild Rivers Code,

47 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
[Xj No -Gotoass [_] Yes

IPA, schedule 8, part 1, table 4, item 3(c)fii): IP Regulation, schedule 2. table 2, item 8: IP Regulation, schedule 1, pant 3, table 4, item 3
Water Act 2000, section 966A (wild river area)(Note: no current Wild River declaration identifies taking o1 interfering with subartesian water as assessable)
Wild River code (Note: the code does not currently contain applicable provisions for sub artesian water}

48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for
interfering with overland flow water (other than using a water truck to pump water}?

DX] No -Gotwas9 ([_] Yes - Answer both (a) and (b) below

IPA. schedule 8 part 1. lable 4, items 3{c}{i} and 3f0). 1P Reguiaton, schedule 2. table 2. tem 9. IP Requiauon, schedule 1. part 3. table 4 item 3A: Water Act 2000 section 9668 (wud
iver area}. relevant wikt river declaration, Wiki Rivers Code

Page 27

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
49 ls the proposed operational work for the following?

(i) For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)
&} No CL Yes
Act 2008
(i) To increase the storage capacity of a referable dam by more than 10% & No [Yes

If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ky) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

IPA, schedule 8, part }. table 4 dem 4; IP Regulation, schedule 2, table 2, tem 10

 

\TIDAL WORK; WILD RIVER AREA 5 ]

4.10 1s any of the proposed operational work tidal work, other than excluded work defined under the IPA?
[C1 No -Gotoas11 §<j Yes - Answer (a) and (b) below
(a) Is any of the proposed tidal work prescribed tidal work?
—X] Yes [_] No

If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild
Rivers Act 2005?

{XJNo [] Yes
{f no, is the work proposed in a canal?
(X) No (] Yes
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

N34) No - (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency.

OC] Yes - (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment
Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency.

(b)_ Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?

(i) One only local government tidal area [J No & Yes
(ii) Starting in one local government tidal area and extending into another local B] No Cl Yes
government tidal area (but in no strategic port tidal area)
(ii) In two or more local government tidal areas but not starting in either local
government tidal area DJ No Cy Yes
(iv) One only strategic port tidal area — No (1 Yes
(v) Atal area that is not a strategic port tidal area or a local government tidal Ba No Cl Yes

Note: The answers you provide in (i) - (v) above may affect who the Assessment Manager is for the application.

IPA, schedule 8, part 1, table 4, item 5; IP Regulation, schedule 2, table 2, items 12. 14 and 17; IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995, section 1044 (wild river area)

ICOASTAL MANAGEMENT DISTRICT; WILD RIVER AREA |

 

4.11 |s any of the operational work proposed to be carried out within a coastal management district?
DX] No -Gotoasi2 (] Yes

IPA, schedule 8, part 1, table 4. item 5; IP Regulation, schedule 2, table 2, items 12 and 14; IP Regulation, schedule 1, part 3, table 4, items 4A and §
Coastal Protection and Management Act 1995 Act 1995, section 104A (wild river area): Wild Rivers Act 2005, section 43A

WATERWAY BARRIER WORKS; WILD RIVER AREA |

 

4.412 Is any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
Bd No -Gotoas13 (_] Yes

IPA, schedule 8, part 1, lable 4, tem 6; IPA, schedule 8. part 2, table 4, item 2. Fishenes Regulation 1995 113A (self-assessable codes), IP Regulation, schedule 7, table 2. item 78 P
Roguiahun, schodte 1, part 3. table 4, item 6 Fistieries Act 19%, section /60 (wild river area). Wild Rivers Act 2005, section 43A

Page 28

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 22

DECLARED FISH HABITAT AREA; WILD RIVER AREA ]
413 ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the

Fisheries Act 1994?

[XJ No - Gotoas.r

Yes

IPA scnedive 2 part] table 4 tee 7 IPA schedule F prt 7 tadk 4 tom 3 Fisheves Reguiaton 1982 <7 7A iselt- assessable codes IP Regaaan schedute? rable 2 nem Os 1
Reg ett Credbke T part 3 able ftom 7 Aig Rrvery Act 2003 sechors 424 £ shenes Act sechos: /nDC {ankt ive onde

 

IREMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA |

414 ls any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 19947
[XI] No -Gotoaa15 (_] Yes

“A schedule @ part 1 tabk 4 Hem 8 IPA schedule» pant 2 lable 4. tem 4 bishenes Requiations 1945 91134 fell assessable codes} IP Regulation, seneuute 2, able 2 ter 29 1P
Regain schedule 1} pat 3 rable $item B Frsherns Act 1984 secnon TEDB vankd over area) Mkt Rivers Act 200 secon {3A relevaot rad ie ctectaranon acid Reerss Cage

 

 

\WILD RIVER AREA |
415 {s any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?

No -Gotoa4is [_] Yes
IPA, schedule 8, part 1, table 4, item 10; IP Regulation, schedule 2, table 2, item 37; Wild Rivers Act 2005, sections 42, 43A

 

ISTATE-CONTROLLED ROAD |

4.16 \s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
[XI No -Endofsections [_] Yes

IP Regulation, schedule 2, table 2, item 3

 

Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for negligence) for errors or
omissions of any kind or for any {oss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.

 

 

 

Page 29

Brdowe of cment'p. eee |

LAND TITLE ACT 1994

REGISTRATION CONFIRMATION STATEMENT
NATURAL RESOURCES AND WATER, QUEENSLAND
Title Reference ~- 15962155
This is the current status ef the title as at 09:27 on 31/08/2007
REGISTERED OWNER
Dealing No: 710943674 28/08/2007

MICHAEL JOHN GUTHRIE
SANDY LEE GUTHRIE JOINT TENANTS

ESTATE AND LAND

Estate in Fee Simple

LOT 74 CROWN PLAN N10573
County of MARCH Parish of WEYBA
Local Government: NOOSA SHIRE

BASEMENTS. ENCUMBRANCES AND INTERESTS

1. Rights and interests reserved to the Crown by
Deed of Grant No. 15962155 (ALLOT 74 SEC 4)

ADMINISTRATIVE ADVICBS - NIL

UNREGISTERED DEALINGS - NIL

CERTIFICATE OF TITLE ISSUED - No

DEALINGS REGISTERED

710943671 RELEASE 710943674 TRANSFER
** End of Confirmation Statement **

mM G Locke
Registrar of Titles and Registrar of Water Allocations

Lodgement No: 2375665
office: GOLD COAST

Email: hickeys@hickeylawyers- com.au
HICKEY LAWYERS

po BOX 5559

GOLD COAST MAIL CENTRE 4217

pane V/1

Page 30

individual Owner’s consent to the making of
an IDAS development application

, MichReL Gut tiie

full), as

(insert name in

 

owner of premises identified as follows

1% OULPHIN CreyerT MOUAVILLE' _ fasort

‘street address; lot on plan description; or coordinates of the premises the subject of the
application)

 

consent to the making of a development application under the integrated
Planning Act 1997 by

PuchinvweL PMO SAN vy ETH HIE (insert name of

applicant)

on the premises described above for the purposes of
COSSPUCTING Ar BCAT- cnrtnP

(insert details of the proposed development, eg material change of use for 3 storey apartment
building)

Mud lob.

Signed on the “2 ) tu aayot Muy , 2008

SF

(signature of owner)

 

 

Page 31

Individual Owner's consent to the making of
an IDAS development application

I, SANDY Guy tr ie (insert name in
ful), as

 

owner of premises identified as follows
Va DOP cnescenT NOOAVICLE _ fison

‘street address; lot on plan description; or coordinates of the premises the subject of the
application)

 

consent to the making of a development application under the Integrated
Planning Act 1997 by

MICHREL & JANDY GuUTHIE

applicant)

(insert name of

 

on the premises described above for the purposes of

CON SMUCTING A GAT reAMP
{insert details of the proposed development, eg material change of use for 3 storey apartment
building)

MhMYyu LL AAA (signature of owner)

Signed on the_ 2) WW. day of Moz , 2006
7

 

 

Page 32

 

 

 

DRAWING OF PLAN sist BE RESTRICTED Tp THC STAGE ISDE TE DLE LINER

 

  

qo083

 

 

 

 

 

Sek pack

 

 

 

FOR OPENING NOTHICA

                              

 

 

TOT ETE GE Bae TT ATE

1A FOE ES OTLLE BAGS GPUS Til Fo BATT AR

Allots 72 to 88 of Sec. 4

 

Mocch, ..

istrict Of ...Gympie___.__.

of.

"N1057 3Sh1

 

Aliots 9O ta 120 af Sec. 5
PARISH OF WEYBA

County

 

URVEY
PLAN

SCALE 1+ 8200

BS
®

 

 

 

sare [roe come lL. A.
es10.re| ranze4g

 

 

 

euaeires or

Pobin & She

 

 

 

 

 

 

ose

 

FAVA TIONS:
ares

Moh 08g

 

 

Mpeidion lot

 

 

as,

 

 

ete 78]

[Fab

 

 

 

 

 

 

 

 

 

 

Drawn Teaawnea] conenta] paxgea | Giaarea

wae
ADJUSTMENTS

 

 

 

 

—
GROWN COPYRIGHT RESERVED

wie | Peay _aeee

 

 

 

 

 

 

 

 

S
5
+ (SOON
eof
see” Ik
3;
:
BE
f
i
:
8 |
i
Et
g
é
ie

 

 

 

 

 

 

 

 

OL ez! pRivare

Fit:

 

 

 

|
|

 

 

 

 

Page 33

 

 

BAA WONG OF LAM MUST BE RESTACCTIO FO Teed ERACE WEDS THE SIA LaRt

 

Q
f
a

 

 Gahbounraas bun nonmuGoGAGAhOls ase cannasengna

Perr RCOL

LD tert oa
* qt 44.
ARAN tess

49
yp
ate

a 4.
asad
ERTS Sy
%

  

FOO TE

 

 

 

 

 

FON GPERTIG NOTREATIONS S38 TACK

 

 

 

Perrerrs

ooog4 4

 

 

 

‘LIne 207 we 96k SCIEAT FAVS WAU 0 CAL IWLE TN DETONATE 10 DMFT

 

 

 

 

MERIDIAN

 

 

 

 

 

 

 

 

PARISH |
County . cet aee
LADisteiet ee oe

 

 

 

 

 

 

 

 

 

 

 

pranN.1057.3Sh.2

 

 

 

Page 34

 

 

 

 

THE DESIGN COMPLIES WITH THE IDAS PRESCRIBED
TIDAL WORKS CODE INCLUDING ACHIEVING THE FOLLOWING
SPECIFIC OUTCOMES: 2.1; 3.1; 7.15 12.1; 12.2: 12.3; 12.4; 12.6;
12.7; 13.1 AND 13.2. .

 

 

100 SLAB; SL82
(30 TOP COVER)

LOT 7S

!

150 SLAB; SL&2

 

 

 

 

QMMQGN BOUNDARY

 

 

 

(LOCATED
CENTRALLY)
LAN
\27 ¢

 

 

 

EXISTING DWELLING

 

 

LOT 75

See pa ee

apa ete

 

a REAL PROPERTY,

7. a mt
= >
i

    

DOLPHIN CRESCENT

    

Sao

      
  

EXISTING ,
DWELLING

    
 

 

DESCRIPTION
LOT 74.
N.1057.3°." -
PARISH WEYBA ~
COUNTY MARCH

SITE PLAN
SHOWING ADJOINING ROPERTIES
1200

  

      

 

 

 

MéS GUTHRIE

 

 

 

 

 

 

 

John Nordei
_+ John Norden
PROPOSED | Saseoelter
No.13 Sioa cod oor oes
LOT 74 Se earn eas
DOLPHIN CRESCENT Tents de a EE
NOOSA HEADS | Garman” | O9/62-1 | A

 

 

 

 

af

Page 35

 

 

 

 

 

 

 

 

 

 

LONGITUDINAL SECTION 1.0

MEASUREMENTS ALONG CENTRELINE

L 3809 CLA

 

 

 

r— SLE2 LOCATED
CENTRALLY

180

 

 

 

 

ht be

 

SEK

 

 
  
    

REVETMENT WALL DETAIL

4:20

 

d
ct

 

N12 BARS, 750 LONG @ 300 MAX CRS ty .
EPOXYED 125 INTO DOSTING REVETIENT,
WALL NB: COAT ARST 7Omm OF EXPOSED

 

 

 

NOTES:

\ . .
1. DIMENSIONS SHALL NOT BE SCALED Rom DRAWINGS.
2. ALL WORKMANSHIP AND MATERIALS SHALL COMPLY

PROTECTION AGENCY. Lo ' :

_ (

3. CONCRETE SHALL HAVE A MINIMUM 26 DAY COMPRESSIVE
STRENGTH OF 40 MPa WITH 60 SLUMP. NOT WITHSTANDING
CONCRETE SHALL HAVE A WATER / CEMENT RATIO OF 0.5.

4. FRESHLY PLACED CONCRETE SHALL BE PREVENTED
FROM-EXPOSURE TO WAVE ACTION BY PLYWOOD OR PLASTIC
SHEETING PROPERLY SECURED IN PLACE.

-§, MESH REINFORCEMENT SHALL BE LAPPED A MINIMUM

OF ONE BAR SPACING PLUS 25mm. ‘ALL REINFORCEMENT
SHALL HAVE A MINIMUM COVER OF 60mm.

{
\
I
t

 

 

 

 

 

 

 

 

 

 

 

M&S GUTHRIE ;g RABRINKETY EID T/A oe :

PROPOSED © _ John Norden | seem

BOAT RAMP | & Associates ‘ a co

No.13 Fac eeanetntadeees | SSE oe,

LOT 74 ee WORKING DRG
DOLPHIN CRESCENT | 288 [=e oar —
NOOSA HEADS  Eeatgtumemm |. O9/G2-2 A

 

 

 

 

 

 

Page 36

a )

7 ifr

 

Sunshine Coast LAND USE SECTION FEES

Regional Council

 

RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
+ APPLICATION FEES ,
Material Change of Use - Code/tmpact
hy Consistent §21
Inconsistent 521
‘ Assessment under Superseded Planning Scheme 521
Modification to a Development Permit 521
Extension of a Currency Period . 521
Operational Works - Landscaping §21
Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW
Half Hour 522
One Hour 522°
ADVERTISING .
Purchase Advertised Applications 523
JETTIES ‘
Jetty Application Fee - {Utes 524
Jetty Bond . : Soo... 51
. . : (Category 4)
BONDS
* Performance Bond 51
. (Category 9)
SIGNS
Registration Fee : . 222
RCH FEE . .
Search of Land Use Section file. 112
Liquor Licensing Request : 113

 

toraL $ (Nt S “EXD -

NAME: CREpPT RBS AL
ADDRESS: [> POLE CHES - a.
NOSAVNSs CO Kee.

 

 

 

FILE NO: DATE: (77/1 AEA |
RECEIPTNO: © 34 3B Signature of TP Officer:

{ f
AUTHORITY NO:

 

Np ost Joos |

Page 37

CALCULATION OF FEES

 

APPLICATION

FEE

TOTAL
FEES

 

MCU - CODE ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

MCU - IMPACT ASSESSMENT
Details of Development

Consistent 1.0
Inconsistent 3.0

FEE CALCULATION

 

OPERATIONAL WORKS
Details of Development

vecomaty “hand.

 

 

 

 

TOTAL FEES

 

"194s

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1065 - Prescribed Tidal Works - Transport Type 5 - Domestic Marine [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.