Council archive · source document
09/1065 - Prescribed Tidal Works - Transport Type 5 - Domestic Marine [As Published] · 142009.1065
DERM Permit number: IPCC01530509 CONDITIONS OF APPROVAL General Permit Condition Agency Interest: Coastal! 1 All works are to be constructed in accordance with the attached approved drawings and specifications listed in the approved plans section in the Notice attached to this permit. The chief executive administering the Coastal Protection and Management Act 1995 may order the works to be removed or modified, within a reasonable time, if the works have or are likely to have a significant effect on coastal management because the works: (a) create a navigation hazard or other danger to the public; or - (b) cause erosion or land degradation; or (c) are unstable or have not been constructed according to the approved plans. All reasonable and practicable measures must be taken to prevent pollution of watercourses or stormwater systems as a result of silt run-off, oil and grease spills from machinery, concrete truck washout and alike. Concrete agitator wash out must only be conducted in a specified area to facilitate the removal of waste concrete from the area to landfill. Wastewater from cleaning equipment must not be discharged directly or indirectly to any watercourses or stormwater systems.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1065 - Prescribed Tidal Works - Transport Type 5 - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.