EGX_PROD_n6829410_191_Hollett_Road,_Noosaville_L53_SP163571
Attached to the e-mail 152006.1999.4 - Affected entity response notice -191 Hollett Road Noosaville.
20 December 2019
Noosa Council
PO Box 141
Tewantin QLD 4565
Attn: Kerri Coyle
Via email: [email protected]
Cc John & Kathleen Hofmann
c/- JFP Urban Consultants Pty Ltd
T1. 209 Kon-Tiki Business Centre, 55 Plaza Parade
Maroochydore QLD 4558
Attention: Allison Drabsch
Via email: [email protected]
Dear Kerri,
Affected Entity Response Notice – Change Application for a Minor
Change to reduce the number of residential lots under Development
Approval 152006.1999 – Development Permit for Reconfiguring a Lot (1
into 52 residential lots, new road and park) at 191 Hollett Road,
Noosaville (Lot 53 on SP163571)
Applicant Ref: M1775
Council Ref: 152006.1999.4
Our Ref: HBD 6829410
We refer to the abovementioned Change Application, notice of which has
been given to Energex Limited pursuant to section 80 of the Planning Act
2016. As an affected entity for the Change Application, we advise that
Energex objects to the proposed changes.
In carrying out our assessment, we have reviewed the Change Application Enquiries
material submitted to Energex on 29 November 2019, in addition to our Benjamin Freese
historical records for this application. Our assessment has also been Telephone
undertaken against the purposes of the Electricity Act 1994 and Electrical (07) 3664 5097
Safety Act 2002, being primary matters Energex has regard to in carrying out Facsimile
its referral agency and affected entity duties. (07) 3664 9829
Email
benjamin.freese@
Justification for our objection is as follows: energyq.com.au
A development application was originally referred to Energex as an
Corporate Office
advice agency on 30 October 2006. Energex provided a response to 26 Reddacliff Street,
Noosa Shire Council on 28 November 2006, which advised that the Newstead QLD 4006
development may be approved in principle, subject to conditions. A GPO Box 1461
copy of this response is enclosed for reference (refer Attachment 1). Brisbane Qld 4001
Notably, Energex’s referral agency response provides in principle Telephone (07) 3664 4000
support for a perpendicular road crossing of Easement B on Facsimile (07) 3025 8301
www.energex.com.au
RP177295, for which Energex is the grantee.
Energex Limited
ABN 40 078 849 055
Reference: HBD 6829410
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 7 pages
Page 2
2
We understand that the development application was refused by Sunshine
Coast Council, as directed by the Department of Environment and Resource
Management, on 16 November 2009. This decision was subsequently appealed
in the Planning and Environment Court, with the matter settled on 5 July 2013.
The approved development included an amended Proposal Plan M1775-12E.
Notably, the amended lot configuration resulted in an approximate 170 metre
section of road coinciding with Easement B on RP177295. It also resulted in an
increase in the number of lots/future dwellings in proximity to the high voltage
electricity infrastructure corridor. Energex have no record of having been
afforded the opportunity to provide further comment on this amended plan,
despite the obvious conflict between the development and Energex’s interests
on the site.
The amendments outlined in the point above, being the road within Easement B
on RP177295 and the increased number of lots/future dwellings in proximity to
the high voltage electricity infrastructure corridor are maintained (with some
changes) in Proposal Plan M1775-13E submitted as part of the subject Change
Application. Energex is unsupportive of the proposed lot configuration on the
following basis:
1) As noted previously, Energex’s referral agency response dated 29
November 2006 provides in principle support for a perpendicular road
crossing only. Such a design outcome is considered appropriate, as the
impacts to Energex’s electricity infrastructure and easement rights are
suitably limited and/or managed. The amended proposal, including
approximately 250 metres of road within Easement B on RP177295,
involves additional impacts on Energex’s interests, for which insufficient
information has been provided; and
2) The lot configuration shown on amended Proposal Plan M1775-13E results
in a total of eight (8) lots directly interfacing Easement B on RP177295,
being Lots 27-29 and 35-39. There is insufficient information provided to
demonstrate the concept of prudent avoidance for future dwellings on these
lots, particularly those with building envelopes in close proximity to the high
voltage electricity infrastructure corridor (i.e. Lots 35-39). This issue should
not be deferred to future dwelling house development applications, given
their potential categorisation as accepted development, subject to
requirements.
Energex may revise its position in relation to the Change Application, subject to the
Applicant submitting an amended proposal showing a perpendicular road crossing of
the easement and/or further detailed assessment addressing the following issues:
Road Design within Easement B on RP177295
The Applicant is to provide further detailed plans/drawings of the proposed road design
that demonstrate the following:
The proposed road design within Easement B on RP177295 including a
detailed conductor survey (in plan and profile) of the development in relation to
Energex’s asset. These drawings and conductor survey are to be prepared by a
suitably qualified professional. Energex’s requirements for the conductor survey
are outlined in Attachment 2;
Reference: HBD 6829410
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
Page 3
3
Statutory clearances in accordance with the Electrical Safety Regulations 2013
are maintained after completion of roadworks. This includes ground clearances
and clearances to road equipment, such as lighting structures; and
Compliance with Energex’s Distribution Earthing Manual regarding clearances
to transmission structures.
Note: the Applicant is to liaise with Energex regarding specific road design
requirements to accommodate the 132kV electricity infrastructure corridor. Where
required to facilitate the development, the Developer/Applicant will be responsible
for any design and construction costs associated with relocation of electricity
infrastructure and/or other general works on the easement.
Prudent Avoidance
The Applicant is to provide an EMF Report prepared by a suitably qualified
professional, which as a minimum, addresses the following points:
Current and future levels of EMF at the common boundary of Easement B on
RP177295 and any proposed lots;
Compliance to applicable standards for EMF with reference to ARPANSA and
other international standards; and
Practical measures to reduce EMF to demonstrate the concept of prudent
avoidance
Note: the subdivision plan is to be amended to incorporate any recommendations of
the EMF Report.
Should you require further information regarding this matter, please contact the
undersigned on (07) 3664 5097 or [email protected] faithfully,
Benjamin Freese
Town Planner
Encl. Attachment 1 – Copy of Energex Advice Agency Response, dated 28 November 2006
Attachment 2 – Required Documentation for Conductor Survey
Reference: HBD 6829410
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency
Page 4
@
28 November 2006
RECEIVcJ
29 NOV 2006
NOOSA
SHIRE COUNCIL
Chief Executive Officer
Noosa Shire Council
PO Box 141
TEWANTIN QLD 4565
Attention: Michael Hagan
Dear Michael
Proposed Reconfiguration of a Lot application (83 lots), 191 Hollett
Street, Noosaville (Lot 53 on SP163571)
We refer to correspondence from Jones Flint & Pike dated 30 October 2006
regarding the above proposal.
Pursuant to the following item of Schedule 2 of the Integrated Planning
Regulation 1998, ENERGEX Limited is an advice agency for the above
development application.
Item 20, Table 2 of Schedule 2 of the Integrated Planning Regulation 1998.
4 tem 8, Table 3 of Schedule 2 of the Integrated Planning Regulation 1998.
Item 9, Table 3 of Schedule 2 of the Integrated Planning Regulation 1998.
Item 10, Table 3 of Schedule 2 of the Integrated Planning Regulation 1998.
ENERGEX Limited acting as an advice agency under the Integrated Planning
Act 1997 provides its response to the above material change of use and
reconfiguration as attached.
Should you require any further information on the above matter, please
telephone our Mr Liam Wiley on (07) 3407 4815.
Yours fatthfully
for Town Planhing Manager
cc: Jones Flinf'& Pike
Reference: HBD313709 - (710/23/11 P23-02) -L1167
VON,
NY
e
GS
%
Q 1
UALIT
\GEME!
YSTE
ye Rata TATE
jo ODE RATA CERTIVTED,
age
7
Enquiries
Liam Wiley
Telephone
(07) 3407 4815
Facsimile
(07) 3407 4144
Email
[email protected]
Corporate Office
150 Charlotte Street
Brisbane Qld 4000
GPO Box 1461
Brisbane Qid 4001
Telephone (07) 3407 4000
Facsimile (07) 3407 4609
www.energex.com.au
ENERGEX Limited
ABN 40 078 849 055
Page 5
RESPONSE TO DEVELOPMENT APPLICATION ENERGEX Limited acting as an advice agency under the Integrated Planning Act 1997, response to the proposed development is: This application be refused for the following reasons: or x This application be approved in principle subject to the following conditions: When considering any future works either on ENERGEX easements or in the vicinity of ENERGEX assets, please be aware of the following general conditions: Any further proposal for works or development on the easement including those involving changes in ground level and retaining wall designs around towers and poles must have prior approval from ENERGEX. Please submit the relevant civil design to the Principal Mains Design Engineer for approval. Satisfactory clearance from any proposed structure to the existing (and/or future) electricity wires must be maintained in accordance with the Electrical Safety Regulations 2002. No civil works are to occur within 5 metres of any part of a tower base, pole or stay. Trenches in excess of 5metres in depth must have a minimum horizontal séparation, from the trench to any tower base or pole, at least equal to the trench depth. Natural ground levels on the easement should not be disturbed without ENERGEX approval. ENERGEX trenching requirements for the installation of pipe include full depth shoring of trench sides for 5 metres either side of a structure. The trench is not to be left open overnight and backfill is to be compacted in 150mm layers in the immediate vicinity of the structure. Final ground levels should slope gently to the edge of the easement, surrounding area or kerb such that pooling of water on the easement is avoided and conductor ground clearances are not decreased. 10 metres clear access must be provided around all towers and pole structures. Stockpiling of spoil on the easement is prohibited. Lighting structures are not permitted in the easement without prior written consent of ENERGEX. Underground services should be kept to the outer edge of the easement and any crossing of the easement should be clearly marked. Please submit the relevant design drawings to the Principal Mains Design Engineer for review. The identification, assessment and mitigation of any possible hazards in the service due to electromagnetically induced voltages, is the responsibility of the developer. Any cut in the vicinity of a structure or between a structure and the road kerb will need to be stabilised by a retaining wall. The retaining wall design and location is to be submitted to ENERGEX for approval. Reference: HBD313709 - (710/23/11 P23-02) — L1167
Page 6
e Access to the easement and access along the easement must be available to ENERGEX personnel and heavy equipment at all times. ENERGEX will require the developer / owner to supply and install gates where fencing prohibits access to and along the easement area. To enable travel along the easement at anytime the gates must be series locked with an ENERGEX padiock. Both the padlock and a design drawing of an acceptable gate will be provided by ENERGEX. e Any costs incurred by ENERGEX as a result of the works on the easement are to be met by the property developer / owner. e At ail times the following clearance must be maintained from the top of any machinery moving in the vicinity of energised conductors: * 132kV and 110kV conductors — 4.5m minimum clearance © 33kV and 11kV conductors —- 3m minimum clearance Should it be necessary to transport equipment or extend any equipment, such that these clearances cannot be confidently maintained, you are required to contact our office to ascertain whether a Safety Officer is required on-site. All operators of machinery are to be made aware of the presence of high voltage conductors. e« Any proposal for landscaping on the easement must have prior approval from ENERGEX. Please submit the relevant landscaping design to Principal Mains Design Engineer for approval. When considering landscape designs the planting of trees must be kept to the edges of the easement and not under any overhead conductors. When mature, plants or trees must not grow in excess of 4 metres in height. If pertinent the ENERGEX Guide to “Powerline Friendly Plants” will be enclosed, please refer to this Guide for recommended species. Reference: HBD313709 - (7140/23/11 P23-02) — L1167
Page 7
«
@
z ‘ Ce ee Ea a v >)
@| es See ee © (recseus sions sar ssn ar 18828 ns ROCKY POINT ROAD, NOOSAVILLE seat 1 1 oe
Seer FED | cecummonewavaominenorsmennenn SS ———aaer on
ES SS [ol [ome fa toa [ome =e J&KHOFMANN | M1775-02C
nae os ax] Seeeneeeeres, somes tai [oa i
ee | SS Ee eee ~ = PROPOSAL PLAN i
\\ Shae oe [ae AS eee I, 7 Kae inmate —)
(— NOTES
land end for approval to Reconfigure the land described in 20m ROAD 330m 1400m
the plan and is not to be used for any other purpose or by
STATISTICS ILOW DENSITY |HIGH DENSITY| RURAL PURSUIT | |
orngamemrrreister v0.0 Ls | |
ve use :
to accompany ah application fo NOOSA SHIRE COUNCIL (000m? min.) 8 be 2 |
for a Development Permit for Material Change of Use of the LENGTH OF NEW /
DEVELOPABLE AREA 20.tha 32.3ha 25.5ha
other person ation.
SONES FLINT 8 PIKE PTY. LTD, acoopts no responsibilty AVERAGE LOT SIZE li7ha | 0.52ha 12.75ha
for any loss or damage suffered howsoever arising to any TOTAL AREA 20.8ha 35.2ha 25.5hq
person or corporation who may use or rely on this plan
peed ereendences AREA PARK Pathe
clauses 2, 3 or 4 hereof.
(2) The contours on this plan are approximate and are suitable
‘only for the purpose of this application. The accuracy of the
s
'
‘contours has not been verified end no reliance should be g tC]
placed upon such contours far any purpose other than for
the purpose of this application, VY
(3) The dimensions, areas, size and location of Improvements,
flood information (if shown) and number of lots shown on this
plan are approximate only and may vary. a: )
(4) Contour information shown on this plan was provided by
Downes Survey Group. VO
(5) This plan may not be photocopied unless this note is incuded. 34
SSS
ror saseypy
20m SPATIAL BUFFER:
LEGEND
ENDANGERED REMNANT VEGETATION
OF CONCERN REMNANT VEGETATION
NOT OF CONCERN REMNANT VEGETATION
DENSITY LINE (PLAN OF DEVELOPMENT)
PROPERTY DESCRIPTION
LOT 53 ON SP163571
PARISH OF TEWANTIN / WEYBA
COUNTY OF MARCH
TOTAL AREA 110.0 ha
MERIDIAN: SP 163571
CONTOUR INTERVAL = 5m
!
i
Page 8
Attachment 2 – Required Documentation for Conductor Survey
Where an applicant wishes to change surface levels on an easement containing Energex
Overhead Transmission assets they shall provide drawings showing a plan and profile view of
the development in relation to the Energex asset.
These drawings shall be produced specifically for this process and shall show:
- The easement boundary and title
- The location of Energex structures, poles, towers and the like within the easement
- The location of the proposed structures
- The proposed finished surface levels
- The clearance from proposed ground level or structure (existing and proposed) to the
lowest conductors when operating at their maximum operating temperature (in profile)
- The clearance from proposed objects to conductors when in the blowout condition (in plan)
- A ground profile under the conductors
The drawings shall be based on a survey of the Energex assets which shall be carried out by a
licenced surveyor. The survey shall include the following:
- Profile of the ground along the line of the lowest conductor(s)
- Any ground features higher than the general surroundings in the vicinity of the conductors
- Ground level at the base of the Energex structure
- Conductor and insulator attachment points
- Minimum of 5 points along the length of the catenary(s) and the ground level below
- Time and date of the survey
- Ambient weather conditions including
o Temperature (in shade)
o Wind speed
o Cloud cover (sunny, some cloud, overcast, rain etc)
The drawing shall show the conductor at its maximum operating temperature (in profile) and
show the blowout condition in plan (500Pa wind at 35 deg C).
Energex will supply the developer with:
- The type of conductor
- The feeder load at the time of the survey
- The maximum operating temperature of the feeder
The electrical calculations shall be carried out by an appropriately qualified RPEQ to determine
the conductor position at maximum operating temperature and the conductor blowout.
The drawing(s) shall contain a table of survey points and a table showing:
- Time and date of survey
- Feeder Load at time of survey
- Ambient weather conditions at time of survey
- Conductor type
- Maximum Operating Temperature
- Calculated tension at 15 deg C
The drawing(s) shall be signed by the RPEQ.
Reference: HBD 6829410
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency