Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Att 3_CMP - Final

of 65

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

     © COPYRIGHT COX GROUP PTY LTD

     ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN
                                                                                                                         Client           Project                Project Address   Document Control Status:
     PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT


    Rev               Description                                    By          Date                                                                                                         DEVELOPMENT APPLICATION
    1   Development Application                                    GSW        13.12.18                                   ANGUS DOUGLASS   PEREGIAN               6 HERON ST
                                                                                                                                                                 PEREGIAN BEACH    A3 DRAWING SHEET                           Drawn:           AM

                                                                                                                                                                                   Co-ordinated:                 GSW          Scale:           A3
                                                                                         Cox Architecture                Project No.      Drawing Title          Drawing Number:
                                                                                         Level 2, 2 Edward Street,                                                                 Project Architect:            GSW          Date:       13.12.18
                                                                                         Brisbane, QLD 4000, Australia
                                                                                         T + 61 7 3210 0844
                                                                                         F + 61 7 3210 0541
                                                                                                                         416089           PHOTOMONTAGE - HERON   02-13             Project Director:             TM           Revision:         1

                                                                                         www.coxarchitecture.com.au
                                                                                                                                          STREET                                   Cox Architecture Pty Ltd ACN 002 535 891

PLOT STAMP DATE: 13/12/2018 2:59:21 PM
Log in to download the original file

Att 3_CMP - Final.pdf · 9.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.