Original source · versioned page text
Att 3_CMP - Final
ROOF OVER LIFT AND SERVICES
RISERS BEYOND. SHOWN GREY
BOUNDARY
BOUNDARY
FOR CLARITY
8M HEIGHT CURRENT DA
PARAPET WEST
PARAPET EAST
RL 16.185
15.860 RL
PLANTERS BEHIND SCREEN
ROOF PLANT DECK
14.610 RL
NORFOLK PINES
PLANTERS BEHIND SCREEN
LEVEL ONE
11.410 RL
AWNING
HERON NEIGHBOURING BUILDINGS
STREET
BINS
LEVEL G
8.210 RL
© COPYRIGHT COX GROUP PTY LTD
ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN
Client Project Project Address Document Control Status:
PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT
Rev Description By Date DEVELOPMENT APPLICATION
1 DA Information Request GSW 12.03.19 ANGUS DOUGLASS PEREGIAN 6 HERON ST
PEREGIAN BEACH A3 DRAWING SHEET Drawn: Author
Co-ordinated: Checker Scale: 1 : 100 A3
Cox Architecture Project No. Drawing Title Drawing Number:
Level 2, 2 Edward Street, Project Architect: Designer Date: 12.03.19
Brisbane, QLD 4000, Australia
T + 61 7 3210 0844
F + 61 7 3210 0541
416089 WEST ELEVATION 30-10 Project Director: Approver Revision: 1
www.coxarchitecture.com.au Cox Architecture Pty Ltd ACN 002 535 891
PLOT STAMP DATE: 12/03/2019 5:10:30 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.