Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Att 3_CMP - Final

of 65

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                                                                                                                                                                                  www.invarion.com


TGS AND SITE LOCATION OVERVIEW

   TGS SCHEDULE                                             TABLES AND REFERENCES                                                                                              MAP LOCATION
 1. TDC4398                                             * CURRENT EDITION MUTCD PART 3: NOV 2018
                                                        * TRAFFIC CONTROLLER ACCREDITATION SCHEME APPROVED
 2. TDC4399
                                                          PROCEDURE [TCASAP]
 3.
                                                        * TRAFFIC MANAGEMENT FOR CONSTRUCTION OR
 4.                                                       MAINTENANCE WORK CODE OF PRACTICE 2008
 5.
                                                        * RISK MANAGEMENT GUIDELINES. COMPANION TO
 6.                                                       AS/NZS 2004
 7.
 8.
                                                                                             TABLE 4.2 VALUE OF DIMENSION D
 9.
                                                                          Posted Speed Limit, km/h                             Dimension D [mtr]
 10.                                                                        [Prior to Roadworks]
                                                                                      40 or less                                            5 to 10
                                                                                         50                                                10 to 15
                                                                                         60                                                15 to 45
                                                                                       70,80                                               60 to 80
                                                                                      90,100                                               80 to 100
                                                                                        110                                             100 to 120

                                                                                     TABLE 4.6 RECOMMENDED TAPER LENGTH

                                                                         Permanent Posted                      Recommended Taper Length, mtr
                                                                             Speed,
   PERMIT APPROVALS                                                           km/h
                                                                                                     TC at beginning
                                                                                                         of taper
                                                                                                                           Lateral shift
                                                                                                                              taper
                                                                                                                                                       Merge taper

                                                                             40 or less                    15                   5                          15
                                                                                50                         15                  15                          30
                                                                                60                         30                  30                          60
 COUNCIL:                                                                       70                         30                60 ­ 80                    120 ­ 160
 Permit #                                                                       80                         30                60 ­ 80                    120 ­ 160
 Dates:                                                                         90
                                                                               100
                                                                                                           30                60 ­ 80                    120 ­ 160
                                                                                                           30                60 ­ 80                    120 ­ 160
 Times:                                                                   Greater than 100                 30                60 ­ 80                    120 ­ 160
 Expiry:
                                                                                              TABLE 4.11 MINIMUM LANE WIDTHS

                                                                         Posted Speed Limit During Roadworks,                         Minimum Lane Width,
 TMR:                                                                                   km/h                                                 mtr
 Permit #                                                                             60 or less                                                3.0
 Dates:
                                                                                       70 to 90                                                 3.2
 Times:
 Expiry:                                                                           Greater than 90                                              3.4
                                                                                                                                                                               SCOPE OF WORKS
                                                                                                                                                                               Construction of commercial premises.
 QPS:
 Permit #
 Dates:
 Times:
 Expiry:




     N                                                                                                                      Job Location                                                                  Disclaimer: This plan has been prepared as a guide for Traffic Management
                                                                                                                                                                                                                           Purposes from information supplied by third parties.
                                           The Traffic Design Company                                                                                  TGS & SITE                              The Traffic Design Company at all times attempt to be as accurate as possible but disclaims all
                                                                                                                                                                                                       responsibility and all liability (including without limitation, liability in negligence)
                                                                                                                                                                                                                                                                                                   Legend
                                                                                                                                                       OVERVIEW                               for all expenses, losses, damages and costs you might incur as a result of the information being       Work Area
                                                                                                                                                                                                                    inaccurate or incomplete in any way, and for any reason.
                  DESIGNED BY: KIM KNAPP    SITE DETAILS ­ Activity:                         Term Of Works:
                                                                                                                            Client
                                                                                                                                     XXXXXXXXXXX                                                                                                                                                     Cone
                  TMD OPEN: 157                          Road Type:                          Travelled Path:                Job No.                                  Date:       Version:
                                                                                                                                                                    XX/XX/XXXX                      A site specific risk assessment conducted by a competent person is required before               Tubular
Orginal Size A4   SIGNED:   KKnapp                       Road Width:
                                                         Posted Speed:
                                                                                             Control Type:
                                                                                             TC Requirement:
                                                                                                                            Sheet No.                 Scale
                                                                                                                                                                NTS        NTS
                                                                                                                                                                     Map No.
                                                                                                                                                                                                                                   Implementing this plan.
                                                                                                                                                                                                                                                                                                     Barrier
Log in to download the original file

Att 3_CMP - Final.pdf · 9.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.