RFI - Attachment 2B - Response by Walsh Engineerging.pdf
3. Provide revised preliminary engineering plans supported by MUSIC modelling which demonstrate
that the pollutant load reduction targets will be achieved prior to discharge from the subject site.
Refer to preliminary engineering drawing P07 and the attached MUSIC Model. Catchment
specific bioretention basins will be provided for new roof and hardstand areas. Rainwater
harvesting and reuse will also be included as part of the proposed water quality management
scheme.
8. Undertake detailed assessment of the proposed changes to the parking layout including:
a) Compliance with the AS2890 Australian Standard series.
Refer to preliminary engineering drawing P06 for details of aisle widths, ramp gradients and
parking bay dimensions. The internal road network generally complies with AS2890.
b) The refuse vehicle swept path assessment indicates that it is extremely tight. It should be redone
using an appropriate clearance envelope and with the vehicle travelling on both directions along the
critical parts of the route.
Refer to preliminary engineering drawing P05 for details of service vehicle swept paths. The
existing access driveway is generally adequate for the design vehicle (waste collection vehicle).
Some minor pavement widening will be required in order to accommodate the entry and exit
manoeuvres of the waste collection vehicle.
Please contact the undersigned at our Maroochydore office if additional information is
required.
Yours faithfully
Michael Colnan
for WALSH CONSULTING ENGINEERS
[OCR of page images]
WALSH
CONSULTING
ENGINEERS
3. Provide revised preliminary engineering plans supported by MUSIC modelling which demonstrate
that the pollutant load reduction targets will be achieved prior to discharge from the subject site.
Refer to preliminary engineering drawing PO7 and the attached MUSIC Model. Catchment
specific bioretention basins will be provided for new roof and hardstand areas. Rainwater
harvesting and reuse will also be included as part of the proposed water quality management
scheme.
8. Undertake detailed assessment of the proposed changes to the parking layout including:
a) Compliance with the AS2890 Australian Standard series.
Refer to preliminary engineering drawing P06 for details of aisle widths, ramp gradients and
parking bay dimensions. The internal road network generally complies with AS2890.
b) The refuse vehicle swept path assessment indicates that it is extremely tight. It should be redone
using an appropriate clearance envelope and with the vehicle travelling on both directions along the
critical parts of the route.
Refer to preliminary engineering drawing POS for details of service vehicle swept paths. The
existing access driveway is generally adequate for the design vehicle (waste collection vehicle).
Some minor pavement widening will be required in order to accommodate the entry and exit
manoeuvres of the waste collection vehicle.
Please contact the undersigned at our Maroochydore office if additional information is
required.
Yours faithfully
M—
Michael Colnan
for WALSH CONSULTING ENGINEERS
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (RFI - Attachment 2B - Response by Walsh Engineerging.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.