Original source · versioned page text
RFI - SWMP Elands
The original of this document is very large (17.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
65-67 Elanda Street, Sunshine Beach Site Based Stormwater Management Plan _____________________________________________________________________________________________ events. Higher flow prediction from Rational Method is expected, as represented by Table 3.3 and Table 3.4. However, both modelling results indicate that the proposed development would cause similar amount of flow increase. Therefore, it is confirmed that the proposed development will likely cause flow increases that could create actionable nuisances. The above table 3.5 represent a 20% increase in rainfall intensity in accordance with Noosa Planning Scheme Policy. Although the difference in flows increase in all events the increase is a maximum of 3L/S. This increase in minor and with the proposed detention tank outlet flows this increase will have no negative impacts. File Name: WCD-22936 – 65-67 Elanda_SWMP.docx Revision: B 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.