RFI - SWMP Elands

of 96

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (17.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________
In table 3.7, the sum of the peak flow represents the mitigated post-development peak flows.
In order to assess the efficiency of the proposed detention tank, flow results are further
compared, as shown in Table 3.8.

Table 3.8 Flow outcome assessment

            Storm Event      Unmitigated Post-       Mitigated Post-     Pre-development
                             development Peak    development peak flow   peak flow (m3/s)
                                 Flow (m3/s)               (m3/s)
        63% AEP, 25min                0.031                0.019              0.017
        39% AEP, 25min                0.036                0.022              0.022
        20% AEP, 25min                0.051                0.031              0.035
        10% AEP, 25min                0.061                0.039              0.046
        5% AEP, 25min                 0.070                0.044              0.054
        2% AEP, 25min                 0.074                0.054              0.059
        1% AEP, 25min                 0.082                0.062              0.069



In Table 3.8, it can be observed that after the mitigation of the detention tank the peak flows
are significantly reduced in comparison to the unmitigated post-development peak flows.
Moreover, through the comparison between the mitigated post-development peak flow and
the target flow of mitigation, it can be observed that the proposed stormwater system
achieves the target of “no-worsening”.




File Name:            WCD-22936 – 65-67 Elanda_SWMP.docx
Revision:             B                                                                     18
Log in to download the original file

RFI - SWMP Elands.pdf · 17.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.