Original source · versioned page text
RFI - SWMP Elands
The original of this document is very large (17.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
65-67 Elanda Street, Sunshine Beach Site Based Stormwater Management Plan _____________________________________________________________________________________________ Table of Contents 1. EXECUTIVE SUMMARY 4 1.1 Introduction 5 1.2 Objectives 5 1.3 Development Details 6 1.4 Site Characteristics 6 1.4.1 External Catchment Analyses 6 1.4.2 Existing Land Use and Stormwater Discharge 6 1.4.3 Proposed Land Use and Stormwater Discharge 7 2. LAWFUL POINT OF DISCHARGE 8 3. HYDROLOGICAL MODELLING AND ANALYSES 9 3.1 Modelling Parameters and Strategy 9 3.2 Modelling of Peak Discharge and Impact Assessment 10 3.3 Modelling of Detention Devices 15 3.4 Stormwater Quality 19 4. CONCLUSIONS & RECOMMENDATIONS 20 4.1 Proposed Stormwater Management Plan 20 4.2 Recommendations 20 4.2.1 Construction Phase 20 4.2.2 Pre-Construction 20 4.2.3 During Construction 20 4.2.4 Post Construction 21 4.2.5 Operational Phase 21 5. REFERENCES 22 Appendices A ~ Survey Plan & Architectural Plans B ~ Rainfall Intensity and Coefficients from BOM C ~ Runoff Hydrographs from Storm Events with Multiple Durations D ~ Rational Method Calculation E ~ Concept Stormwater Drainage Layout Plan F ~ Detention Tanks Flow Hydrographs and Water Levels File Name: WCD-22936 – 65-67 Elanda_SWMP.docx Revision: B 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.